Vco_s1_1.12 municipal electrical invoice optimization MITIGATION
It is important to check that contracted power is in line with the actual expenditure of municipal buildings. Otherwise, an analysis is proposed to modify these parameters in order to significantly reduce the municipal energy cost.
Implementation Timeframe: 2019-2030
Sector: Municipal
Vco_s1_1.13 reactive energy compensation MITIGATION
After carrying out a municipal electrical invoice optimization, it is proposed to size the capacitor banks in those municipal facilities / buildings that require it.
Implementation Timeframe: 2019-2022
Sector: Municipal
Implementation Cost: 2.000,00€
Vco_s1_1.02 energy audits of municipal buildings MITIGATION
Vco_s1_1.06 replacing municipal buildings' indoor lighting MITIGATION
It is intended to renew the lighting equipment following criteria of energy efficiency and optimization of lighting demand.
Implementation Timeframe: 2019-2022
Sector: Municipal
Implementation Cost: 39.894,00€
GHG Reduction: 173.36 tonnes
Vco_s1_1.08 improvement of the envelope MITIGATION
It is proposed to make the necessary changes in the envelope of municipal buildings to ensure maximum energy efficiency of the building against the specific climate of the municipality.
Implementation Timeframe: 2019-2027
Sector: Municipal
Implementation Cost: 135.000,00€
GHG Reduction: 23.91 tonnes
Vco_s1_1.10 computer and printing equipment optimization MITIGATION
It is proposed to automatically disconnect computer equipment of the main administrative buildings at the end of the working day in order to reduce electricity consumption.
Implementation Timeframe: 2019-2022
Sector: Municipal
Implementation Cost: 840,00€
GHG Reduction: 47.90 tonnes
Vco_s1_2.02 exchange of sodium lamps for led streetlights MITIGATION
This action consists in replacing the high pressure or high intensity discharge gas lamps (mercury vapor lamps, high pressure sodium vapor lamps and metal halide lamps) for more efficient ones such as LED technology.
The objective is to replace 100% of the municipality streetlighting lamps. It will be translated into 403,48MWh of energy-saving and 313,10 tCO2 reduction. Furthermore it will also allow an improvement of the quality and light confort in the streets of the municipaliy.
Implementation Timeframe: 2019-2022
Sector: Municipal
Implementation Cost: 459.200,00€
GHG Reduction: 313.10 tonnes
Vco_s1_2.06 public lighting monitoring system MITIGATION
The implementation of a public lighting monitoring system allows to control public lighting on-off, adapt the intensity of lighting on the streets of the municipality and to management and anticipate future faults in the lighting.
Implementation Timeframe: 2019-2027
Sector: Municipal
Implementation Cost: 241.500,00€
GHG Reduction: 129.59 tonnes
Vco_s1_3.05 developing a study to reduce water losses in supply network MITIGATION ADAPTATION
It is proposed to carry out a study improve the efficiency of the networks by reducing losses throughout the water cycle. It is also proposed to establish a measurement system to control losses and to quickly correct detected problems.
Implementation Timeframe: 2019-2030
Sector: Buildings
Implementation Cost: 12.000,00€
Vco_s3_3.01 awareness campaign about sustainability and energy efficiency oriented to citizens MITIGATION ENERGY POVERTY
The City Council will carry out information and awareness campaigns focused on the efficient use of energy resources, measures to improve energy saving, waste separation, photovoltaics or solar thermal in residential buildings and financial resourses avaible to implement them, water saving measures, etc, among others.
Implementation Timeframe: 2019-2030
Sector: Residential
Implementation Cost: 3.000,00€
GHG Reduction: 253.80 tonnes
Vco_s5_1.02 electric vehicles for municipal staff MITIGATION
This measure is focused on the incorporation of electric vehicles to the municipal fleet. It could helps to encourage citizens who live in the municipality to change their old vehicle into an electric one.
Implementation Timeframe: 2019-2027
Sector: Transport
Implementation Cost: 156.000,00€
GHG Reduction: 22.45 tonnes
Vco_s5_1.03 bus and taxis stops improvement MITIGATION
The aim of this measure is to develope a study in order to analyze current status of bus and taxis stops in the municipality. It will help to know the real conditions of them and to carry out improvement or renewal plans.
Implementation Timeframe: 2019-2027
Sector: Transport
GHG Reduction: 91.43 tonnes
Vco_s5_3.09 charge points network to electric vehicles MITIGATION
This action is to implement municipal charging station for electric vehicles in order to promote the acquisition of this type of vehicle among citizens and to reduce the CO2 emissions associated with conventional vehicles.
Implementation Timeframe: 2023-2030
Sector: Transport
Implementation Cost: 15.000,00€
GHG Reduction: 4.43 tonnes
Vco_s9_1.05 energy advisory service in residential, tertiary, primary and industrial sector MITIGATION
The aim of this action is to provide an energy and climate change advisory service whose main objective is to disseminate to residential, primary, tertiary and industrial sector all information related to energy efficiency, renewable energy, financial resourses available in the field of energy efficiency and renewable energy, etc.
Implementation Timeframe: 2019-2030
Sector: Other
Implementation Cost: 50.000,00€
GHG Reduction: 312.69 tonnes
Vco_a1.1.1 fit out a municipal building as a refuge for climate emergency ADAPTATION
Establish policies to improve the resistance of buildings to the climate effects
Implementation Timeframe: 2023-2026
Sector: Buildings
Implementation Cost: 160.000,00€
Vco_a6.1.1 technical study to assess urban solutions to the risks of climate change ADAPTATION
Incorporate into urban planning the risks due to climate change.
Implementation Timeframe: 2023-2026
Sector: Buildings
Implementation Cost: 35.000,00€
Vco_a10.1.1 elaboration of municipal emergency plan ADAPTATION
Developing a Municipal Emergency Plan in order to identify and assess the climate risk that the municipality could suffer, setting an emergency protocol.
Implementation Timeframe: 2019-2022
Sector: Buildings
Implementation Cost: 15.000,00€
Action Plan
Target 2030
Approval date: 2020-01-31
| Acta aprobación plenaria Plan de Acción por el Clima y la Energía Sostenible. Municipio de Valleseco | es | Download |
|---|---|---|
| Anexo I - Inventario de Emisiones de Referencia. Municipio de Valleseco | es | Download |
| Anexo II - Valoración Económica del Plan de Mitigación. Municipio de Valleseco | es | Download |
| Anexo III - Fichas de Acciones de Mitigación. Municipio de Valleseco | es | Download |
| Anexo IV- Estudio de Evaluación de Riesgos y Vulnerabilidades. Municipio de Valleseco | es | Download |
| Anexo V - Fichas de Acciones de Adaptación. Municipio de Valleseco | es | Download |
| Anexo VI - Fuentes de Financiación. Municipio de Valleseco | es | Download |
| Anexo VII - Participación Ciudadana. Municipio de Valleseco | es | Download |
| Plan de Acción por el Clima y la Energía Sostenible. Municipio de Valleseco | es | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2020.