Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Promoting use of solar energy in households MITIGATION
Promotion campaign for solar energy among locals with the following methods:
- banners and fliers with information about solar energy technologies,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
Implementation Timeframe: 2023-2030
Sector: Residential
Implementation Cost: 18.000,00€
Thermal insulation of roof and basement ceiling of kindergarten MITIGATION ADAPTATION
Thermal insulation of walls, socles, roofs with mineral wool (min. thickness 100 mm) and XPS polystyrene (min. thickness 70 mm)
Implementation Timeframe: 2024-2027
Sector: Buildings
Implementation Cost: 51.000,00€
thermal insulation of walls of kindergarten MITIGATION ADAPTATION
Thermal insulation with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2027
Sector: Buildings
Implementation Cost: 60.000,00€
Thermal insulation of walls of lyceum hirbovat MITIGATION ADAPTATION
Thermal insulation with mineral wool and XPS polystyrene
Implementation Timeframe: 2023-2026
Sector: Buildings
Implementation Cost: 74.500,00€
Thermal insulation of walls of hirbovat primary school MITIGATION ADAPTATION
Thermal insulation with mineral wool and XPS polystyrene
Implementation Timeframe: 2023-2026
Sector: Buildings
Implementation Cost: 62.000,00€
Promoting the use of biomass in residential buildings MITIGATION ADAPTATION ENERGY POVERTY
Promoting campaigns for use of biomass in residential buildings among locals (demonstration of projects, awareness raising trainings)
Can be performed in partnership with Agency for Energy Efficiency, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 12.000,00€
Construction of a 200 kw photovoltaic park in hirbovat MITIGATION
Installation of solar PV stations with total capacity of 200 kW in different forms of financing and ownership: public, public-private, private.
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 175.000,00€
Installation of 4 biomass boilers for local public institutions, totaling 450 kw MITIGATION
Installation of 4 biomass boilers for local public institutions, totaling 450 kW
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 153.000,00€
Construction of sewer networks MITIGATION ADAPTATION
Construction of new sewer networks
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 142.000,00€
Solid waste management system MITIGATION ADAPTATION
Organization of waste management system that will include:
- separate waste collection
- transportation of waste
- waste sorting and recycling
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 145.000,00€
Planting of about 250 ha of new forests and forest strips MITIGATION ADAPTATION
Planting of about 250 ha of new forests on degraded lands and in places with erosion. Planting of forest strips to protect population and agricultural lands from heavy weather conditions
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 28.000,00€
Renovation of the landfill in hirbovat (organization of the waste transport service) MITIGATION ADAPTATION
Collection and transport of household waste with specific machinery to avoid impact on the population
Implementation Timeframe: 2023-2025
Sector: Buildings
Implementation Cost: 65.000,00€
Action Plan
Target 2030
Approval date: 2024-06-24
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Hirbovat | ro | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.