Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Moldova, Republic Of
Committed since 2023
|
Iacob Stegarescu
|
||
|
Mayor
|
MAIN CONTACTS
| Iacub Stegarescu |
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Thermal rehabilitation of the suhuluceni kindergarten MITIGATION ADAPTATION
Thermal rehabilitation of the Suhuluceni Kindergarten (thermal insulation of the walls, ceiling, floors, roof reconstruction, replacement of 50% of the windows, installation of the recovery ventilation system)
Implementation Timeframe: 2023-2030
Sector: Environment
Implementation Cost: 150.000,00€
Changing of existing street lighting and extending the network. installation of the intelligent lighting system MITIGATION
Changing 7 km of existing street lighting (lamps, pylons, wiring) and extending the network by another 15.7 km. Installation of the intelligent lighting system
Implementation Timeframe: 2023-2030
Sector: Municipal
Implementation Cost: 250.000,00€
Thermal rehabilitation of the suhuluceni gymnasium MITIGATION ADAPTATION
Thermal rehabilitation of the Suhuluceni Gymnasium (thermal insulation of the walls, ceiling, floors, replacement of 30% of the windows, installation of the recovery ventilation system)
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 250.000,00€
Promotion of thermal insulation measures among the commune citizens MITIGATION ADAPTATION
Promotion of thermal insulation measures among the commune citizens (25% of residential buildings will be thermally insulated, the effect – consumption 30% lower).
Promoting campaigns for thermal insulation of houses by: small grants, demonstration projects, awareness raising trainings.
Can be performed in partnership with Agency for Energy Efficiency, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Promotion of alternative electricity and thermal energy solutions among the locals MITIGATION ADAPTATION
Promotion of alternative electricity and thermal energy solutions among the locals (100 households will install solar panels and/or solar collectors)
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Procurement of electric buses (2 units) with approx. 30 places - joint project with the coropceni village MITIGATION ADAPTATION
Procurement of electric buses (2 units) with approx. 30 places - joint project with the Coropceni village.
For the moment none of the mentioned villages has own public transport. Dependency from private transport companies and bus drivers makes vulnerable commune citizens.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 240.000,00€
Construction of the solar photovoltaic station with a power of 1 mw (private partnership) MITIGATION
Construction of the solar photovoltaic station with a power of 1 MW (private partnership)
Implementation Timeframe: 2023-2030
Sector: Electricity
Implementation Cost: 800.000,00€
Organization of waste collection system with waste separation MITIGATION ADAPTATION
Organization of the waste collection system by fractions – procurement of dumpsters, arrangement of the garbage disposal according to sanitary norms. Organization of municipal company that will take care of wastes collecion, separation and disposal.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Cleaning the water of the 56 ha lake – joint project with the village of coropceni MITIGATION ADAPTATION
Cleaning the water of the 56 ha lake – joint project with the village of Coropceni.
Installation of the aerators in different places of the lake to increase the level of oxygen in the lake and speed up the process of decomposition of organic substances.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 150.000,00€
Planting forests and protective strips on agricultural fields, ponds, streams – 50 ha MITIGATION ADAPTATION
Planting forests and protective strips on agricultural fields, ponds, streams – 50 ha
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Action Plan
Target 2030
Approval date: 2023-12-20
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Suhuluceni | ro | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.