Key Actions
Use of renewable energy sources in budget buildings MITIGATION
Implementation of a hot water system with solar collectors, use of heat pumps in public buildings
Implementation Timeframe: 2023-2030
Sector: Municipal
Implementation Cost: 1.345.500,00€
Implementation of the smart light intelligent lighting control system MITIGATION
Creating a system of automated and dispatcher management and control of urban outdoor lighting, using solar power plants for lighting
Implementation Timeframe: 2025-2027
Sector: Municipal
Implementation Cost: 14.001.050,00€
Use of “green energy” in residential buildings MITIGATION
Solar electricity generation, use of heat pumps, electricity generation at the landfill
Implementation Timeframe: 2026-2030
Sector: Residential
Implementation Cost: 9.087.878,00€
Protection and rational use of water resources ADAPTATION
- Bringing sanitary protection zones and water protection zones of drinking water sources into compliance with regulatory requirements;
- Assessment of the environmental and hygienic condition of drinking water sources for compliance with the established requirements;
- Designing and mapping of coastal protection strips of rivers and community reservoirs outside settlements;
- Carrying out works on landscaping, clearing and improving the sanitary and ecological condition of streams and water bodies;
- Creation of mass recreation areas on the banks of local water bodies and rivers for Voznesensk community residents, in compliance with sanitary and environmental standards
Implementation Timeframe: 2025-2028
Sector: Buildings
Implementation Cost: 4.208.000,00€
Quarantine plant control programs ADAPTATION
- Organize a survey of the Voznesensk community (establishing the actual territory and developing a map of the foci of spread of existing quarantine plants with the definition of their areas);
- Organization of the elimination of quarantine plants in the designated areas (elimination of quarantine plants by mechanical and chemical means, planting of perennial plants in the areas affected by quarantine plants);
- Organizing and conducting information and explanatory work among the population.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 1.635.000,00€
Protection and rational use of natural plant resources ADAPTATION
- Creation of an electronic register of green spaces (including within the sanitary protection zones of enterprises) and introduction of relevant amendments to the General Plan;
- Removal of hazardous trees and sanitary pruning (crown) of old trees;
- Restoration and preservation of the city's green spaces, maintenance of existing parks, and creation of new green areas, planting of green spaces;
- Formation of the appropriate dendrological composition of green spaces;
- Organization of works on creation and operation of green areas of the city;
- Design and construction of an irrigation system for green spaces;
Implementation Timeframe: 2026-2028
Sector: Buildings
Implementation Cost: 404.250,00€