Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Ukraine
780 801 inhabitants
Committed since 2022
|
Andriy Sadovyy
|
||
|
Mayor
|
MAIN CONTACTS
| Myroslava Hishchak |
IN ACTION
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Increasing the level of technical operation of budget buildings, through the implementation of energy efficiency measures
Implementation Timeframe: 2021-2030
Sector: Municipal
Implementation Cost: 821.918,00€
1. Implementation of the Program of current repair and maintenance of the outdoor lighting system of the city of Lviv for 2020-2022"
2. Overhaul and reconstruction of outdoor lighting networks of streets, alleys, squares, architectural monuments
Implementation Timeframe: 2021-2030
Sector: Electricity
Implementation Cost: 4.282.021,60€
The project "Modernization of heat supply infrastructure in the city of Lviv" (installation and connection of ITP, installation of electrical equipment and other devices at all heat supply facilities, replacement of heat lines)
Implementation Timeframe: 2013-2028
Sector: Heat
Implementation Cost: 9.567.567,60€
Carrying out actions "day on foot to school" or "Rover to school", promotional campaigns on the rational use of cars, PR campaigns, brochures with illustrations for parents-drivers, lessons on traffic safety for schoolchildren, manuals for teachers on traffic safety, conducting Days without a car, European Mobility Week, promotion of multimodality
Implementation Timeframe: 2022-2030
Sector: Other
Implementation Cost: 10.811,00€
240 km. pedestrian and bicycle routes
Implementation Timeframe: 2021-2030
Sector: Transport
Implementation Cost: 5.405.405,00€
1. Integrated thermo-modernization of buildings, improvement of their technical condition, and working with the surrounding areas. 2. Modernization of the housing stock in the historical part of the city by developing projects for renovation of districts. 3. Improvement of standards of housing construction and the formation of a high-quality living environment.
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 1,00€
Increasing the comfort of the pedestrian space of Lviv:
• Development of the most comfortable pedestrian and bicycle connections within the districts (elimination of obstacles and barriers, maximum use of landscaping, convenient and logical transitions).
• Arrangement of green lines between different parts of the city.
• Adaptation of intra-quarter transport highways in order to improve the ability to cover short distances on foot or by bicycle.
• Arrangement of the territory adjacent to real estate development projects in accordance with the principles of sustainable mobility.
• Brownfield revitalization.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 1,00€
Development of information and educational campaigns on the importance of the use of land resources in the city and biodiversity (posters, seminars, photo exhibitions, and other events) to support and strengthen the planned activities in the field of the use of land resources and biodiversity. Organization of training for interested parties to achieve optimal results.
Implementation Timeframe: 2020-2030
Sector: Tourism
Implementation Cost: 1,00€
Municipal enterprises, equipment (heating and water supply)
Implementation Timeframe: 2008-2020
Sector: Heat
Implementation Cost: 24.834.385,00€
Action Plan
| No documents available |
|---|
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2023.