Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Ukraine
Committed since 2018
|
Ruslan Trebushkin
|
||
|
Mayor
|
MAIN CONTACTS
| Hanna Nechai | ||
| Iryna Schvets |
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
4.1.7. reconstruction of boiler houses #13, #14, #17, #19, #20 with installation of biofuel (pellet) boilers, and individual boilers for schools #9, #2 and pre-schools #4,5,8,10,11,12,63,37,38,39 MITIGATION
Reconstruction of boiler houses #13, #14, #17, #19, and #20 includes the installation of biofuel (pellet) boilers to enhance energy efficiency and sustainability. Additionally, individual boilers will be installed in schools #9 and #2, as well as pre-schools #4, 5, 8, 10, 11, 12, 63, 37, 38, and 39, ensuring reliable and eco-friendly heating solutions.
Implementation Timeframe: 2024-2030
Sector: Heat
Implementation Cost: 5.077.333,00€
4.6.1. comprehensive thermal modernization (24 institutions of the education department and other educational institutions) MITIGATION
Comprehensive renovation and insulation of refrigerated walls; enhancement of thermal protection for lightweight glazed enclosures; improvement of thermal insulation for external walls; pipeline insulation; and major repairs and thermal upgrades of refrigerated walls across:
- 24 facilities under the Department of Education and other educational institutions
- 13 of healthcare
- 5 facilities of culture department
Implementation Timeframe: 2019-2030
Sector: Municipal
Implementation Cost: 3.089.100,00€
4.6.2 comprehensive thermal refurbishment of residnetial buildings MITIGATION ENERGY POVERTY
Replacement of heating system main line insulation (where necessary), thermal refusrbishment of buildings envelope modernization of the building’s entry group, and replacement of windows with energy-efficient metal-plastic units for the following:
- 198 buildings of 4-5 floors;
- 50 buildings of 9-10 floors;
- 234 buildings of 2-3 floors;
- 26 buidlgins of 1 floor.
Implementation Timeframe: 2023-2030
Sector: Residential
Implementation Cost: 18.146.833,00€
A2 construction and architectural adaptation group of measures ADAPTATION
The measure aims to enhance climate resilience in new urban developments by using flood-resistant and heat-durable construction materials and designs. It includes the integration of green zones with tree plantings, lawns, and flowerbeds to provide shade, reduce heat accumulation, and improve microclimate conditions. The development of recreational areas, such as parks with fountains, ponds, and artificial water bodies, will contribute to additional cooling and humidity regulation. Additionally, the use of light-colored, reflective building materials and permeable surfaces for pavements and parking areas will help minimize heat absorption and facilitate rainwater infiltration, reducing.
Implementation Timeframe: 2018-2030
Sector: Buildings
Implementation Cost: 2.118.000,00€
A3 engineering and technical adaptation measures ADAPTATION
The measure focuses on protecting the northern, eastern, and southeastern parts of the city from flooding through a comprehensive set of hydrotechnical solutions. These include the creation of a gravity-based surface runoff drainage system, groundwater level reduction through drainage pipes, restoration of natural watercourses, and organized wastewater management with sealed septic systems. The city-wide implementation of stormwater drainage infrastructure, regular maintenance, and the development of rainwater harvesting systems for household and garden use are also key components. In addition, measures will promote water-saving technologies, improve drinking water quality control, and ensur
Implementation Timeframe: 2018-2028
Sector: Buildings
Implementation Cost: 545.000,00€
A1 organizational and management set of adaptation measures ADAPTATION
It includes: Implementation of a warning system for severe weather in the area, Monitoring of affected population groups, Development of plans for responding to severe weather and other conditions, Developing plans for forgetting new areas of the area the provision of their security, the creation of enterprises and the surrounding subdivision of the KP "UZhKG".
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 350.000,00€
Action Plan
| No documents available |
|---|
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2025.