Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Ее modernization of interior lighting systems in community-owned institutions MITIGATION
The effect of the proposed measures is based on the following assumptions: average capacity of the incandescent lamps used for indoor lighting is 75W, the number of annual working days of the system is 250 days, the average daily duration of operation of one lamp is 3 hours, the capacity of newly LED lamps replacing the old system 15W, by 2024, about 65% of incandescent lamps in the indoor lighting systems of community buildings (240 kW), have been replaced with new LED systems. From 2024 to 2026 it is envisaged to replace about 1730 incandescent lamps with a total installed capacity of about 130kW that are still in operation in the community-owned buildings with new LED systems.
Implementation Timeframe: 2020-2026
Sector: Municipal
Implementation Cost: 14.000,00€
Ее modernization of community-owned organization buildings MITIGATION
The following activities are envisaged in 10 kindergartens, 5 cultural institution and 3 sports schools:
- Installation of double-glazed windows with metal-plastic or aluminum (with a thermal break core) PVC frames. Replacement of external doors;
- Thermal insulation of the attic floor with expanded perlite bags (d=150 mm),
- Thermal insulation of external walls with 50-100 mm expanded polystyrene (EPS) / extruded polystyrene (XPS) thermal insulation boards;
- Replacement of the heating system with natural gas condensing boilers, modernization of the heat supply network (only in the case of structures with gas supply).
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 5.300.000,00€
Power supply of community-owned structures through pv plants MITIGATION
Despite the fact that solar irradiation rate in Vanadzor is not as high as in other regions of RA, energy supply of community-owned structures via renewable (solar) technologies is important to ensure reliability of power supply and decarbonization. In order to partially satisfy the electricity demand of the municipality and fully satisfy the electricity demand of 20 community-owned structures, within the framework of this measure it is planned to install an 80 kW peak capacity PV system for the city hall, 5 kW peak capacity individual PV systems for 10 educational institutions and cultural structures, and 10 kW peak capacity PV systems for 5 sports schools.
Implementation Timeframe: 2024-2028
Sector: Electricity
Implementation Cost: 180.000,00€
Inventory, repair or renovation of roofs of buildings ADAPTATION
Inspection of roofs of community buildings and MABs, inventory of roofs vulnerable to heavy rainfall, hail and strong winds, implementation of preventive measures such as repair of vulnerable roofs, replacement of roofing (e.g. with galvanized sheet metal), reinforcement of supporting structures/bearing structures, replacement of worn-out timber, modernization of the drainage system.
Implementation Timeframe: 2024-2028
Sector: Buildings
Implementation Cost: 2.000.000,00€
Modernization of vanadzor street lighting system MITIGATION
Within the framework of this measure, it is planned that by 2026 the Vanadzor street lighting system will be completely equipped with LED lamps, which will replace the high-pressure sodium lamps still in operation. It is estimated that the average individual power of the new LED lamps installed during the system modernization is 80 W.
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 140.000,00€
Renewable energy supply for municipal structures ADAPTATION
This activity envisages wide-spread use of renewable energy sources to increase the independence and reliability of energy supply of community-owned structures and ensuring energy security of the structures in the extreme weather events.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 1.500.000,00€
Adaptation measures in msw management sector ADAPTATION
Improvement of the municipal solid waste management system in accordance with the "Strategic Plan for Solid Waste Management of the City of Vanadzor 2023-2027" approved in 2023, in particular: development of a garbage collection system strategy, establishment of garbage recycling plants, installation of additional garbage bins, acquisition of waste collection equipment, acquisition of new specialized equipment, etc.
Implementation Timeframe: 2024-2027
Sector: Buildings
Implementation Cost: 500.000,00€
Establishment and maintenance of green zones ADAPTATION
Establishment of community green zones or restoration, expansion, provision of water supply and maintenance of existing zones and recreational areas, parks and gardens.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 1.500.000,00€
Action Plan
Target 2030
Approval date: 2025-03-05
| Decision of the Council of Elders of Vanadzoron SECAP | hy | Download |
|---|---|---|
| SECAP of Vanadzor Community | hy | Download |
Target 2020
Approval date: 2017-05-30
| Sustainable Energy Action Plan of Vanadzor Municipality | hy | Download |
|---|
Commitments
| Commitment 2020 | en | Download |
|---|---|---|
| Commitment 2020 | ru | Download |
| Commitment 2020 | hy | Download |
The signatory’s information in MyCovenant was last submitted in 2025.