GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Thermal insulation of walls with mineral wool and polystyrene XPS, replacement of old windows and doors with modern double-glazzed, rehabilitation and insulation of roofs
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 800.000,00€
Hybrid photovoltaic-thermal (PVT) panels include both, solar collector and photovoltaic panel, which generate electricity and hot water. Photovoltaic panels are known to have a shortcoming that as the temperature increases, the electrical efficiency decreases up to 70%, depending of temperature. PVT increases its efficiency by cooling the photovoltaic cells and obtaining hot water for building needs.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 120.000,00€
Installation of Autonomous Energy Systems (SEA) - an autohton invention, a smart and energy efficient combination usage of PVT pannels, heat pumps, hot water boilers and storages and other equipment.
Providing buildings with electricity, heating, domestic hot water and cold.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 375.000,00€
Replacing old technology lights with LEDs in street lighting on 14 km and adding lighting system on 3 more km
Implementation Timeframe: 2024-2034
Sector: Municipal
Implementation Cost: 217.300,00€
Establishment of pellet production based on public-private partnership
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 142.850,00€
Photovoltaic energy generation 1.2MW in different forms of financing and ownership: public, public-private, private.
Implementation Timeframe: 2024-2034
Sector: Electricity
Implementation Cost: 960.000,00€
Currently there is no central sewer in Onitcani, population uses local septics nad outside toilets. It is planned design and construction of a sewage system together with the wastewater treatment plant for approx. 700 households
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 800.000,00€
Afforestation of the banks of the Dniester River with an area of 49.3 ha
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 300.000,00€
On the 2.7 ha area is necessary to clean the springs, to deepen the place of water accumulation. It is necessary to arrange the territory with the planting of trees and shrubs.
The wetland would be flooded from stormwater and springs. It will retain water both temporarily and permanently, as long as environmental conditions allow, it will brake the departure of groundwater into deep. It will maintain a large amount of biodiversity and provide unparalleled natural wealth to adults and children. It will become a rest area with coolness on the heat.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 500.000,00€
The organized collection of solid waste, their transportation to the specially arranged storage place and their qualified storage is necessary. For this, a specialized service is needed, waste and stable knowledge outside the towns, at the place of storage, equipped with transport and specialized cars. The minimum number of staff will organize the removal of the waste to the landfill.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 100.000,00€
The water from the Putna spring has healing properties with a fairly high flow rate and can be used to improve people's health.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 700.000,00€
Planting of 5.6 ha of energy willow for needs of biomass of local population and public institutions. Every two to three years plantation will have a yield of 20t/ha of dry material for pellets or chips. The total biofuel yield can reach 480 tons or 240 tons annually.
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 180.000,00€
Straw, stubble and other agricultural waste can be transformed into biodegradable thermal insulation with a high added value. It has many advantages compared to polystyrene, namely, it is not flammable, it is not toxic and harmful, it is not sensitive to UV rays, it is not sensitive to chemicals (gasoline, kerosene, diesel, acetone, paints, etc.) , mechanical destruction is not easy, there is practically no expansion and contraction during exploitation, etc. At the same time, it is cheap and easy to produce material with a high profit margin. It can be produced locally by any householder. Production does not require high energy consumption and is based on fungal spores
Implementation Timeframe: 2024-2034
Sector: Buildings
Implementation Cost: 100.000,00€
Action Plan
Target 2030
Approval date: 2024-09-23
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Onitcani | en | Download |
Commitments
| Commitment 2030 | ro | Download |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.