Key Actions
3m thermal modernization of bagachev lyceum no. 1 MITIGATION
Implementation Timeframe: 2026-2030
Sector: Municipal
Implementation Cost: 1.389.990,00€
Thermal modernization of bahachevskyi lyceum no. 2 (bmr) MITIGATION
Insulation of external walls with mineral wool at least 200 mm thick and the plinth with EPS (expanded polystyrene) or foam glass, including finishing and mandatory insulation of external window and door reveals.
Insulation of the roof ceiling with 250 mm thick high-density mineral wool.
Insulation of the basement ceiling with 200 mm thick mineral wool.
Replacement of existing windows with new energy-efficient PVC windows with a U-value of 1.11 W/m²·K and argon or krypton gas filling.
Replacement of existing doors with new energy-efficient PVC doors with a U-value of 1.11 W/m²·K and argon or krypton gas filling.
Installation of automated individual heating substations (IHS) with weather
Implementation Timeframe: 2026-2030
Sector: Municipal
Implementation Cost: 166.670,00€
Installation of a solar power plant at the main building of the municipal non-profit enterprise "bahacheve city hospital of the bahacheve city council" MITIGATION
Installation of a 100 kW rooftop hybrid solar power plant with battery storage
Implementation Timeframe: 2026-2030
Sector: Municipal
Implementation Cost: 172.549,00€
Conducting environmental monitoring ADAPTATION
Installation of equipment for an automated air quality monitoring system
Implementation Timeframe: 2026-2035
Sector: Buildings
Implementation Cost: 63.778,00€
Reconstruction of wastewater treatment facilities ADAPTATION
The project entails the reconstruction and modernization of existing wastewater treatment facilities, involving the implementation of modern, energy-efficient wastewater treatment technologies, the replacement of worn-out and obsolete process equipment, and the automation of management and treatment quality control processes.
Implementation Timeframe: 2026-2030
Sector: Buildings
Implementation Cost: 1.525.440,00€
Installation of a waste sorting line with a capacity of 15 tonnes per year ADAPTATION
The project involves the installation and commissioning of a waste-sorting line for the mechanical sorting of municipal solid waste to recover secondary raw materials suitable for reuse and recycling.
Implementation Timeframe: 2026-2040
Sector: Buildings
Implementation Cost: 106.640,00€
Reimbursement from the local budget of interest on loans for energy-efficiency measures under energy-efficiency programs. ENERGY POVERTY
Implementation of a mechanism to reimburse, from the local budget, part or all of the interest on loans obtained by community residents to carry out energy-efficiency measures.
Implementation Timeframe: 2026-2030
Implementation Cost: 72.380,90€