Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Moldova, Republic Of
Committed since 2023
|
Leonid Zalevschi
|
||
|
Mayor
|
MAIN CONTACTS
| Leonid Zalevschi |
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Promoting thermal insulation measures among the residents of the commune (25% of residential buildings will be insulated, resulting in 30% lower energy consumption) MITIGATION ADAPTATION
Promoting campaigns for thermal insulation of houses among citizens (small grants, demonstration projects, awareness raising trainings)
Can be performed in partnership with National Center for Sustainable Energy, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Promoting alternative solutions for electricity and heat among the residents of the commune (200 households will install solar panels and/or solar collectors) MITIGATION ADAPTATION
Promotion campaign for renewable energy sources among citizens with the following methods:
- banners and fliers with information about renewable energy sources,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
Can be performed in partnership with National Center for Sustainable Energy, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Building a solar photovoltaic station with a capacity of 280 kwp to cover energy consumption for water pumps (artesian wells) and the street lighting system MITIGATION
Building a solar photovoltaic station with a capacity of 280 kWp to cover energy consumption for water pumps (artesian wells) and the street lighting system
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 200.000,00€
Building solar photovoltaic stations with a cumulative power of 4 mw (private partnership) MITIGATION
Installation of solar PV stations with total capacity of 4 MW in different forms of financing and ownership: public, public-private, private.
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 2.400.000,00€
Project "an environmentally friendly commune" - organizing the waste management system (in progress) MITIGATION ADAPTATION
Project "An Environmentally Friendly Commune" - Organizing the waste management system (in progress).
Within the project, the Mayoralty aims to actively involve the population in the responsible management of waste, thereby reducing the negative impact on the environment and improving the quality of life in Chetrosu commune. The project aims to reduce the amount of waste in unauthorized dumps, encourage recycling and waste recovery, thus contributing to the protection of natural resources and the enhancement of quality of life.
Project includes procurement of trashbins for separate waste collection and establishment of partnership with local recycling company ”ABS Recycling”
Implementation Timeframe: 2023-2025
Sector: Buildings
Implementation Cost: 50.000,00€
Comprehensive flood prevention measures in the village of todirești ADAPTATION
Overall objective: Prevent flooding of residential areas of Todiresti village resulting from poor rainwater drainage system.
Specific objectives:
-Elaborate project design and improving around 700 m of the rainwater canal system using and demonstrating new technologies and materials (as geosynthetic cementitious composite mat - GCCM, f.e. Concrete Canvas®),
-Elaborate project design and construct rainwater drainage system that will direct rainwater from the streets to the channel;
-Elaborate project design and construct storage for excess of water as part of mentioned rainwater canal system, to collect rainwater for watering
-Create a recreation area
-Promote rainwater harvesting
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 700.000,00€
Planting forests and protective strips around agricultural fields, ponds, and streams – 388 ha MITIGATION ADAPTATION
Planting forests and protective strips around agricultural fields, ponds, and streams – 388 ha
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 200.000,00€
Extension of the street lighting network by another 18.0 km and installation of an intelligent lighting system MITIGATION
Extension of the street lighting network by another 18.0 km and installation of an intelligent lighting system
No energy savings will occure, security and sustainability of the commune will increase
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 250.000,00€
Thermal rehabilitation of the "gr. vieru" gymnasium in chetrosu village MITIGATION ADAPTATION
Thermal rehabilitation of the "Gr. Vieru" Gymnasium in Chetrosu village: thermal insulation of the walls (1799 m²), ceiling (1583 m²), floors (45 m²), installation of a ventilation system with heat recovery (24 units), repair and modernization of natural gas boilers
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 250.000,00€
Action Plan
Target 2030
Approval date: 2024-10-11
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Chetrosu | ro | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.