Key Actions
Thermal insulation of the coropceni kindergarten MITIGATION ADAPTATION
Thermal insulation of the Coropceni Kindergarten (thermal insulation of the walls, ceiling, floors, installation of the recovery ventilation system)
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 70.000,00€
Changing of existing street lighting and extending of system. installation of the intelligent lighting system MITIGATION
Changing 3.2 km of existing street lighting (lamps, pylons, wiring) and extending the network by a further 4.8 km. Installation of the intelligent lighting system.
Implementation Timeframe: 2023-2030
Sector: Municipal
Implementation Cost: 150.000,00€
Thermal rehabilitation of the coropceni gymnasium MITIGATION ADAPTATION
Thermal rehabilitation of the Coropceni Gymnasium (thermal insulation of the walls, ceiling, floors, change of the roof, installation of the recovery ventilation system)
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 150.000,00€
Promotion of thermal insulation measures among locals MITIGATION ADAPTATION
Promotion of thermal insulation measures among locals (25% of residential buildings will be thermally insulated, the effect – 30% lower consumption).
Campaigns can include: small grants, demonstration projects, awareness raising trainings.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Promotion of alternative electricity and thermal energy solutions among the locals MITIGATION ADAPTATION
Promotion campaign for renewable energy sources among locals with the following methods:
- banners and fliers with information about renewable energy sources,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
At least 100 households will install solar PV and/or collectors systems
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Procurement of electric buses (2 units) with approx. 20 places - joint project with suhuluceni commune MITIGATION ADAPTATION
Procurement of electric buses (2 units) with approx. 30 places - joint project with Suhuluceni commune.
Busses will connect villages with district centers. For the moment there is no public transport besides some private buses that are coming ones-twice a week. That makes citizens vulnerable.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 240.000,00€
Cleaning the water of the 56 ha lake (installation of the aerator) – joint project with the village of coropceni MITIGATION ADAPTATION
Cleaning the water of the 56 ha lake – joint project with the village of Coropceni. Installation of the aerators in different places of the lake to increase the level of oxygen in the lake and speed up the process of decomposition of organic substances.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 150.000,00€
Planting forests and protective strips on agricultural fields, ponds, streams – 50 ha MITIGATION ADAPTATION
Planting forests and protective strips on agricultural fields, ponds, streams – 50 ha
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Organization of the separate waste collection system MITIGATION ADAPTATION
Organization of the waste collection system by fractions – procurement of dumpsters, arrangement of the garbage disposal according to sanitary criteria
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Construction of the solar photovoltaic station with a power of 1 mw (private partnership) MITIGATION
Installation of solar PV stations with total capacity of 1 MW in different forms of financing and ownership: public, public-private, private.
Implementation Timeframe: 2023-2030
Sector: Electricity
Implementation Cost: 800.000,00€
Action Plan
Target 2030
Approval date: 2023-12-18