05.03. implementation of energy efficiency measures in residential buildings on the residents' own initiative MITIGATION ADAPTATION ENERGY POVERTY
Implementation of energy efficiency measures in residential buildings on the residents' own initiative: insulation of walls, ceilings, replacement of windows and doors with metal-plastic energy-efficient ones
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 8.370.000,00€
01.18. installation of a solar power plant with storage capacities on the building of the girskiy lyceum MITIGATION ENERGY POVERTY
The project involves installing a 200 kW solar power plant on the building of the Girskiy Lyceum in the village of Gora, which will provide the institution with its own electricity and reduce costs. The plant will consist of photovoltaic modules, inverters, batteries and a monitoring system, will cover the basic needs of the lyceum, and the surplus can be used by the community or fed into the grid. (completed PKD)
Implementation Timeframe: 2026-2027
Sector: Municipal
Implementation Cost: 330.000,00€
A05. construction of storm sewers on the street section of the village gora ADAPTATION
This project will be implemented to ensure the proper functioning of households, public institutions, institutions in the village of Gora, avoid flooding of residential buildings, social facilities and transport infrastructure, improve the difficult situation associated with the state of rainwater and meltwater drainage from the village and prevent possible emergencies.
The results of the project will have an environmental impact, since the organization of stormwater drainage will improve the quality of water that enters local open water bodies and groundwater.
The collector route is a natural thalweg where rainwater and meltwater flow, the catchment area is 100-150 hectares. During the floo
Implementation Timeframe: 2026-2027
Sector: Buildings
Implementation Cost: 2.600,00€
A20. shelterbelts of life in a hirska community ADAPTATION
Shelterbelts of Life is a project that has already begun in the community.
The project aims to restore forest belts that are in neglected or poor condition; establish new forest belts (plant trees) that are well suited to local climatic conditions; raise awareness among communities about the ecological role of forest belts in the face of climate change; promote changes in legislation aimed at ensuring that the protection and maintenance of forest belts is more structured.
On November 8, 2024, the establishment of a new shelterbelt between the villages of Revne and Zatyshne was completed with the financial support of ING Bank Ukraine. The project is being implemented under fond Peli can live
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 8.162,00€
A21. introduction and consolidation of the practice of composting fallen leaves and other biowaste after cleaning urban and household areas ADAPTATION
Creation and development in a rural community of a sustainable system for collecting, processing and reusing biowaste: fallen leaves, mowed grass, branches, plant residues and household kitchen biowaste.
Prerequisites: in most rural communities, biowaste is mostly burned or taken to landfills, which leads to: air pollution and increased levels of carcinogenic substances; overloading of landfills; unnecessary financial costs for garbage removal; loss of a valuable resource - organic matter, which can be used as fertilizer.
The goal of the project is to implement infrastructure for effective composting of biowaste and teach community residents sorting and composting methods; ...
Implementation Timeframe: 2025-2027
Sector: Buildings
Implementation Cost: 4.943,00€
05.04. installation of solar power plants and heat pumps in private homes. MITIGATION ENERGY POVERTY
The project involves the installation of solar power plants with a capacity of 5–20 kW in private households and the integration of air-to-water heat pumps with a conversion coefficient (COP) of 3.5–4.2. It is recommended to equip the systems with inverters with a “smart grid” function, storage capacities (for solar power plants) and buffer tanks (for heat pumps) to optimize consumption, which will ensure stable electricity and heat supply with maximum effect from the use of equipment.
Implementation Timeframe: 2025-2030
Sector: Residential
Implementation Cost: 3.380.000,00€
A15. creation and development of park green areas in the village gora ADAPTATION
The goal of the project is to increase the area and orderliness of green areas in the community by developing the Oshytkivskyi Park and arranging a new park zone in the village of Gora.
The park recreational zone “Oshytkivskyi Park” with a rain garden in the village of Gora has been created and is operating, this measure responded to the numerous wishes and suggestions of residents. At the beginning of 2021, the deputies of the Gorsky Village Council approved the community development budget, one of the items of which was work on arranging the Oshytkivskyi Park. The idea of creating this park zone appeared back in 2016, during a public hearing in this area.
The plan to create the park zone
Implementation Timeframe: 2021-2027
Sector: Buildings
Implementation Cost: 161.832,00€
A16. creation of a park recreation area in the village of zatyshne ADAPTATION
The creation of a park recreational area in the village of Zatyshne is a relevant project for the community, which meets the numerous wishes and proposals of residents. The implementation of this project will: 1) increase the indicators of greening of territories in the Hirska TC; 2) provide community residents with conditions for leisure, recreation, and walks; 3) reduce fire hazard indicators in the community by creating an additional reservoir.
The purpose of the project is to create a comfortable, aesthetically attractive and environmentally friendly place for residents and guests of the community to relax by arranging a park with walking paths, bicycle paths, a playground, areas ...
Implementation Timeframe: 2026-2027
Sector: Buildings
Implementation Cost: 36.000,00€