Key Actions
6.2 introduction of renewable energy sources MITIGATION
Installation of 2 hybrid solar power plants with a unit capacity of 10 kW each
Implementation Timeframe: 2024-2030
Sector: Tertiary
Implementation Cost: 143.000,00€
1.02 reconstruction of the power supply system at family medicine clinic MITIGATION
"Reconstruction of the power supply system (installation of a
solar power plant on the roof of the general family medicine outpatient clinic) at the address: Sonyachna Street in the village of Poromiv, Volodymyr district, Volyn region - Installation of a 10 kW hybrid solar power plant on the roof of the Poromivskaya AZPSM KNP
Implementation Timeframe: 2023-2023
Sector: Municipal
Implementation Cost: 12.840,00€
3.1 modernization of the street lighting system MITIGATION
Modernization of the street lighting system involves:
1) replacement of existing CFL luminaires with new energy-efficient LEDs with lower power and improved light output;
2) modernization of 69 street lighting control cabinets;
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 88.895,00€
1.03 implementation of energy efficiency measures in the buzhankiv lyceum named after mykola korzoniuk MITIGATION
Insulation of external walls, attic insulation, floor insulation, reconstruction of heating systems with installation of thermostats and balancing valves, thermal insulation of pipelines, installation of an automatic heat flow control system, replacement of incandescent lamps with LED lamps
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 408.523,00€
A12 application of new information technologies for video surveillance of the community territory against emergencies ADAPTATION
Using information technology (quadcopters) for video surveillance of the community territory for the purpose of early response to forest, agricultural and land fires, flooding, etc.
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 24.400,00€
A11 setting up a system for monitoring the state of the environmental situation ADAPTATION
Installation of equipment for an automated air quality monitoring system (qty - 2 units)
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 127.560,00€
4.4 introduction of renewable energy sources in private households MITIGATION ENERGY POVERTY
Installation of hybrid solar power plants with a unit capacity of 15 kW for 5% of private households (108 units)
Implementation Timeframe: 2024-2030
Sector: Residential
Implementation Cost: 1.542.857,00€
A06 expansion of the existing centralized water supply system in the villages of poromiv, buzhanka and morozovychi construction of new pipeline branches of the existing centralized water supply system ADAPTATION
Construction of new pipeline branches of the existing centralized water supply system
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 633.300,00€