Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Moldova, Republic Of
Committed since 2022
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Thermal insulation of walls, replacement of old windows and doors, rehabilitation of roofs of public buildings and insulation MITIGATION ADAPTATION
Thermal insulation of walls, socles, roofs with mineral wool (min. thickness 100 mm) and XPS polystyrene (min. thickness 70 mm) , replacement of old windows and doors with modern double-glazed, rehabilitation of roofs of public buildings
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 326.625,00€
Solar collectors for water heating and installation of pvt (photovoltaic thermal panels) on roofs and independent units MITIGATION ADAPTATION
Installation of solar collectors for water heating and installation of PVT (photovoltaic thermal panels)
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 120.000,00€
Use of air-to-air or air-to-water heat pumps for heating public buildings and domestic hot water MITIGATION ADAPTATION
Use of air-to-air or air-to-water heat pumps for heating public buildings and domestic hot water
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 229.500,00€
Installation of autonomous energy systems (sea). providing buildings with electricity, heating, domestic hot water and cold. MITIGATION ADAPTATION
Installation of Autonomous Energy Systems (SEA) - an autohton invention, a smart and energy efficient combination usage of PVT pannels, heat pumps, hot water boilers and storages and other equipment.
Providing buildings with electricity, heating, domestic hot water and cold.
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 220.000,00€
Installation of smart street lighting on all streets MITIGATION
Installation of smart LED street lighting on all streets
Implementation Timeframe: 2022-2030
Implementation Cost: 217.300,00€
Photovoltaic energy generation 0.2 mw MITIGATION ADAPTATION
Installation of 200 kW on-ground solar PV station
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 200.000,00€
Design and construction of a sewage system together with the wastewater treatment plant MITIGATION ADAPTATION
Design and construction of a sewage system together with the wastewater treatment plant
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 560.000,00€
Afforestation of the banks of two lakes (47.6 ha) MITIGATION ADAPTATION
Afforestation of 47.6 ha of the banks of two lakes
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 285.000,00€
Afforestation of the banks of the river răut (50.3 ha) MITIGATION ADAPTATION
Afforestation of the banks of the river Răut (50.3 ha)
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 300.000,00€
Action Plan
Target 2030
Approval date: 2022-09-27
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Tarigrad | en | Download |
Commitments
| Commitment 2030 | ro | Download |
|---|---|---|
| Commitment 2030 | ro | Download |
The signatory’s information in MyCovenant was last submitted in 2023.