Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Thermal insulation of walls (the house of culture) MITIGATION ADAPTATION
Thermal insulation of the House of Culture walls with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2028
Sector: Buildings
Implementation Cost: 38.000,00€
Thermal insulation of building walls (floreni high school) MITIGATION ADAPTATION
Thermal insulation of Floreni High School walls with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 122.500,00€
Thermal insulation of building walls (family doctors center) MITIGATION ADAPTATION
Thermal insulation of building walls at Family Doctors Center with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2029
Sector: Education
Implementation Cost: 115.320,00€
Promoting thermal insulation of households MITIGATION ADAPTATION
Promoting thermal insulation of households:
- Banners with information about energy efficiency measures
- Seminars and training sessions with participation from the Agency for Energy Efficiency and financing institutions (EU4Business, commercial banks) to raise awareness
- Other activities
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 7.000,00€
Promoting the use of pv panels through incentives and advertising MITIGATION
Promoting the use of PV panels through incentives and advertising
Implementation Timeframe: 2023-2030
Sector: Electricity
Implementation Cost: 8.500,00€
Greening of degraded areas, parks, woodlands forests (gaps) sloping areas, pastures about 167 ha MITIGATION ADAPTATION
Greening of degraded areas, parks, woodlands forests (gaps) sloping areas, pastures about 167 ha
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 32.000,00€
Installation of biomass boilers for public institutions 80 kw MITIGATION
Installation of biomass boilers for public institutions 80 kW
Implementation Timeframe: 2024-2030
Sector: Municipal
Implementation Cost: 25.000,00€
Thermal insulation of walls - about 550 m2(floreni town hall) MITIGATION ADAPTATION
Thermal insulation of about 550 m2 of Floreni Town Hall walls with mineral wool and XPS polystyrene
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 37.400,00€
Building a 200 kw photovoltaic park MITIGATION
Installation of solar PV stations with total capacity of 200 kW in different forms of financing and ownership: public, public-private, private.
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 170.000,00€
Building wall insulation (kindergarten) MITIGATION ADAPTATION
Thermal insulation with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2027
Sector: Buildings
Implementation Cost: 104.400,00€
Construction of watsewater treatment plant MITIGATION ADAPTATION
Construction of watsewater treatment plant
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 165.000,00€
Local partnership to produce green energy (biogas 0.5 mw) MITIGATION
Local partnership with poultry farm (Floreni SA company) to produce green energy (biogas) with installation of 0.5 MW
Implementation Timeframe: 2024-2030
Sector: Industry
Implementation Cost: 125.000,00€
Promoting the use of biomass for heating among citizens MITIGATION
Promotion campaign for biomass energy among locals with the following methods:
- banners and fliers with information about biomass and biomass boilers,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
Implementation Timeframe: 2023-2030
Sector: Residential
Implementation Cost: 11.000,00€
Solid waste management system MITIGATION ADAPTATION
Organization of solid waste management system:
- separate waste collection system
- waste transportation
- waste sorting and recycling (partnership with special companies)
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 142.000,00€
Thermal insulation of building walls (middle school) MITIGATION ADAPTATION
Thermal insulation of building walls of Middle school with mineral wool and XPS polystyrene
Implementation Timeframe: 2024-2028
Sector: Buildings
Implementation Cost: 87.500,00€
Creation of the sewage system and its expansion ADAPTATION
An efficient sewage system will avoid the discharge of polluted water into the water table and increase the degree of protection of water and health
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 165.000,00€
Afforestation measures ADAPTATION
Afforestation of at least 163 ha of degraded land for protection purposes and the creation of recreational areas
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 45.000,00€
Protection against leachate leaks from the sa floreni warehouse (poultry farm) ADAPTATION
Rehabilitation and arrangement of the open-air landfill of animal waste from SA Floreni to reduce air and water pollution
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 185.000,00€
Action Plan
Target 2030
Approval date: 2024-05-28