Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Armenia
Committed since 2022
SUPPORT
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Energy-efficient modernization of four kindergarten buildings MITIGATION
1. Attic roof insulation with inflated perlite bags (d=150 mm, thermal conductivity coefficient 0.065 W/m0K, normative thermal resistance of the roof 2.736 m2:0C/W);
2. Placing a vestibule at the entrance of the building;
3. Modernization of exhaust ventilation system, installation of ventilation systems equipped with built-in heat recovery systems;
4. Balancing/regulating the heating system.
Implementation Timeframe: 2025-2026
Sector: Municipal
Implementation Cost: 46.000,00€
Energy supply of buildings of four community organizations through pv plants MITIGATION
In order to meet the electricity demand of 4 community structures, it is planned to build 3 rooftop PV systems with a total peak capacity of 35 kW.
Implementation Timeframe: 2024-2026
Sector: Municipal
Implementation Cost: 24.500,00€
Complete thermal modernization of 8 mabs inf the romanian district MITIGATION
The following works are planned:
• Replacement of roofing and thermal insulation of roofs (attics).
• Replacement of porch doors and windows with new energy-efficient windows and doors.
• Thermal insulation of external walls.
• Installation of internal lighting system in porches and stairwells.
Implementation Timeframe: 2023-2025
Sector: Municipal
Implementation Cost: 1.142.000,00€
Adaptation measures in buildings - repair and/or waterproofing ADAPTATION
Inspection of roofs of MABs, inventory of roofs vulnerable to heavy rainfall, hail and strong winds, repair of vulnerable roofs, replacement of roofing (e.g. with galvanized sheet), strengthening of supporting / supporting structures, replacement of worn timber, upgrading of drainage system.
Implementation Timeframe: 2024-2028
Sector: Buildings
Implementation Cost: 1.000.000,00€
Adaptation measures in transport - repair and cleaning of storm water drainage systems and culverts ADAPTATION
Ensuring the smooth operation, proper cleaning, prevention and repair of storm water drainage systems and culverts to prevent road blockages due to flooding and to ensure traffic safety.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 500.000,00€
Adaptation measures in energy sector - res for powering municipal structures ADAPTATION
Large-scale use of renewable energy resources for powering community structures in order to ensure sustainable energy supply in case of extreme weather events.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 500.000,00€
Establishment of urban green zones ADAPTATION
Creation of community green zones or restoration, expansion, provision of water supply and maintenance of existing zones and recreation areas, parks and gardens.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 500.000,00€
Action Plan
Target 2030
Approval date: 2024-08-22
| Decision of the Council of Elders of Stepanavan Community | hy | Download |
|---|---|---|
| SECAP of Stepanavan Community | hy | Download |
Commitments
| Commitment 2030 | hy | Download |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.