Key Actions
Thermal insulation of the external walls (595 m²) of the carbuna village hall building MITIGATION ADAPTATION
Thermal insulation of 595 m² of the external walls of the Carbuna Village Hall building to improve energy efficiency, reduce heat losses, lower energy consumption and decrease CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 42.000,00€
Thermal insulation of the roof slab (150 m²) of the carbuna village hall building MITIGATION ADAPTATION
Thermal insulation of the 150 m² roof slab of the Carbuna Village Hall building to reduce heat losses, improve energy efficiency, increase indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Ict
Implementation Cost: 6.000,00€
Thermal insulation of the external walls (1320 m²) of the "scufița roșie" kindergarten building MITIGATION ADAPTATION
Thermal insulation of 1320 m² of the external walls of the "Scufița Roșie" Kindergarten building to improve energy efficiency, reduce heat losses, enhance indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 150.000,00€
Thermal insulation of the roof slab (1120 m²) of the "scufița roșie" kindergarten building MITIGATION ADAPTATION
Thermal insulation of the 1120 m² roof slab of the "Scufița Roșie" Kindergarten building to improve energy efficiency, reduce heat losses, increase indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Thermal insulation of the ground floor slab (650 m²) of the "scufița roșie" kindergarten building MITIGATION ADAPTATION
Thermal insulation of the 650 m² ground floor slab of the "Scufița Roșie" Kindergarten building to reduce heat losses, improve energy efficiency, enhance indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Agriculture
Implementation Cost: 32.000,00€
Installation of a 100 kw air-to-water heat pump system for the "scufița roșie" kindergarten building MITIGATION ADAPTATION
Installation of a 100 kW air-to-water heat pump system to provide energy-efficient heating and cooling for the "Scufița Roșie" Kindergarten building, reducing energy consumption and CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 100.000,00€
Installation of a decentralized mechanical ventilation system with heat recovery for the "scufița roșie" kindergarten building MITIGATION ADAPTATION
Installation of a decentralized mechanical ventilation system with heat recovery in the "Scufița Roșie" Kindergarten building to improve indoor air quality, reduce ventilation heat losses and increase overall energy efficiency.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 42.000,00€
Thermal insulation of the roof slab (540 m²) of the culture house (library) building MITIGATION ADAPTATION
Thermal insulation of the 540 m² roof slab of the Culture House (Library) building to improve energy efficiency, reduce heat losses, enhance indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 22.000,00€
Installation of a 30 kw air-to-water heat pump system for the culture house (library) building MITIGATION ADAPTATION
Installation of a 30 kW air-to-water heat pump system to provide energy-efficient heating and cooling for the Culture House (Library) building, reducing energy consumption and greenhouse gas emissions.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 18.000,00€
Thermal insulation of the external walls (1080 m²) of the carbuna gymnasium building MITIGATION ADAPTATION
Thermal insulation of 1080 m² of the external walls of the Carbuna Gymnasium building to improve energy efficiency, reduce heat losses, enhance indoor thermal comfort and reduce CO₂ emissions.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 310.000,00€
Installation of a 100 kw air-to-water heat pump system for the carbuna gymnasium building MITIGATION ADAPTATION
Installation of a 100 kW air-to-water heat pump system to provide energy-efficient heating and cooling for the Carbuna Gymnasium building, reducing energy consumption and greenhouse gas emissions.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 130.000,00€
Replacement of existing windows and doors with pvc joinery (320 m²) in the carbuna gymnasium building MITIGATION ADAPTATION
Replacement of existing windows and doors with energy-efficient PVC joinery (320 m²) in the Carbuna Gymnasium building to reduce heat losses, improve thermal performance and increase indoor comfort.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 96.000,00€
Modernization of the indoor lighting system in the carbuna gymnasium building MITIGATION ADAPTATION
Modernization of the indoor lighting system in the Carbuna Gymnasium building through the installation of energy-efficient lighting technologies to reduce electricity consumption and improve lighting quality.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 7.500,00€
Installation of a decentralized mechanical ventilation system with heat recovery for the carbuna gymnasium building MITIGATION ADAPTATION
Installation of a decentralized mechanical ventilation system with heat recovery in the Carbuna Gymnasium building to improve indoor air quality, reduce ventilation heat losses and increase overall energy efficiency.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 111.000,00€
Promotion of thermal insulation measures among residents of carbuna MITIGATION ADAPTATION
Promotion of thermal insulation measures among residents to encourage the renovation of residential buildings. The target is to thermally insulate 10% of residential buildings, achieving an estimated 15% reduction in energy consumption.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Promotion of renewable electricity and heating solutions for households in carbuna MITIGATION ADAPTATION
Promotion of renewable energy solutions for households, encouraging the installation of photovoltaic panels and/or solar thermal collectors. The target is for 10% of households to adopt renewable energy technologies, reducing fossil fuel consumption and greenhouse gas emissions.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 50.000,00€
Promotion of modern high-efficiency heating technologies and renewable energy systems for households MITIGATION ADAPTATION
Promotion of modern high-efficiency heating technologies, including renewable energy systems, to improve household energy efficiency, reduce fossil fuel consumption and decrease greenhouse gas emissions.
Implementation Timeframe: 2025-2050
Sector: Buildings
Implementation Cost: 50.000,00€
Construction of a 190 kw photovoltaic park for cărbuna's own electricity needs MITIGATION
Construction of a 190 kW ground-mounted photovoltaic park to partially cover the electricity needs of Cărbuna village and public buildings, reducing dependence on grid electricity and greenhouse gas emissions.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 175.000,00€
Installation of a 10 kw rooftop solar pv system with battery storage on cărbuna village hall (net metering) MITIGATION
Installation of a 10 kW rooftop photovoltaic system with battery storage on the Cărbuna Village Hall building, under the Net Metering principle and within individual capacity limits, to cover part of the building's own electricity consumption.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 17.000,00€
Installation of a 15 kw rooftop solar pv system with battery storage on cărbuna kindergarten (net metering) MITIGATION
Installation of a 15 kW rooftop photovoltaic system with battery storage on the Cărbuna Kindergarten ("Scufița Roșie") building, under the Net Metering principle and within individual capacity limits.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 25.500,00€
Installation of a 10 kw rooftop solar pv system with battery storage on cărbuna cultural centre (net metering) MITIGATION
Installation of a 10 kW rooftop photovoltaic system with battery storage on the Cărbuna Cultural Centre building, under the Net Metering principle and within individual capacity limits.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 17.000,00€
Installation of a 25 kw solar pv system on cărbuna gymnasium (net metering) MITIGATION
Installation of a 25 kW photovoltaic system (without battery storage) on the Cărbuna Gymnasium building, under the Net Metering principle and within individual capacity limits.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 27.000,00€
Installation of a 20 kw solar pv system on cărbuna family doctor's office (omf) (net metering) MITIGATION
Installation of a 20 kW photovoltaic system (without battery storage) on the OMF Cărbuna (Family Doctor's Office) building, under the Net Metering principle and within individual capacity limits.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 34.000,00€
Modernization of the water supply and sewerage system, including the wastewater treatment plant, in cărbuna MITIGATION ADAPTATION
Modernization of the water supply and sewerage infrastructure, including the wastewater treatment plant, to improve service quality, reduce water losses and pollution of surface and groundwater, and increase environmental and public health protection.
Implementation Timeframe: 2025-2050
Sector: Health
Implementation Cost: 6.300.000,00€
Increasing household connection to organized solid waste management services MITIGATION ADAPTATION
Expansion of organized solid waste management services to increase household coverage, improve waste collection efficiency, reduce uncontrolled waste disposal and decrease greenhouse gas emissions from the waste sector.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 150.000,00€
Establishment of a separate waste collection platform and implementation of local recycling stations ADAPTATION
Construction of a separate waste collection platform and installation of local recycling stations to improve waste sorting, increase recycling rates, reduce landfill disposal and support the transition to a circular economy.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 590.000,00€
Establishment of a 40 ha energy crop plantation for biomass production to support sustainable heating ADAPTATION ENERGY POVERTY
Establishment of a 40 ha energy crop plantation to produce sustainable biomass for heating, with priority given to supporting vulnerable households and reducing energy poverty through the use of renewable energy sources.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 40.000,00€
Development of school programmes on waste separation, composting, rainwater harvesting and solar energy ADAPTATION
Development of school education programmes on separate waste collection, composting, rainwater harvesting and solar energy to increase environmental awareness and encourage sustainable practices among students and the local community.
Implementation Timeframe: 2025-2050
Sector: Buildings
Implementation Cost: 50.000,00€
Implementation of an ecological restoration programme for the ravine area to create recreational spaces and increase carbon sequestration ADAPTATION
Implementation of an ecological restoration programme for the ravine area to create recreational spaces, enhance carbon sequestration, improve biodiversity and strengthen climate resilience through nature-based solutions.
Implementation Timeframe: 2025-2050
Sector: Buildings
Implementation Cost: 95.000,00€
Thermal insulation of the roof slab (1350 m²) of the carbuna gymnasium building MITIGATION ADAPTATION
Thermal insulation of the 1350 m² flat roof slab of the Carbuna Gymnasium building to improve energy efficiency, reduce heat losses, enhance indoor thermal comfort and reduce greenhouse gas emissions.
Implementation Timeframe: 2025-2030
Sector: Health
Implementation Cost: 171.000,00€
Installation of frequency converters for pumping equipment at six artesian wells MITIGATION ADAPTATION
Installation of frequency converters for pumping equipment at six artesian wells to optimize pump operation, reduce electricity consumption, improve the efficiency of the water supply system and reduce greenhouse gas emissions.
Implementation Timeframe: 2025-2030
Sector: Buildings
Implementation Cost: 12.000,00€
Action Plan
| No documents available |
|---|
Commitments
| Commitment 2030 | ru | Download |
|---|---|---|
| Commitment 2030 | ro | Download |
The signatory’s information in MyCovenant was last submitted in 2026.