Key Actions
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 75.200,00€
Insulating the exterior walls with 100 mm mineral wool in Garofita Kindergrten (Cotihana)
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 86.200,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 86.200,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 124.000,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2023-2030
Sector: Buildings
Implementation Cost: 142.000,00€
Insulating the ceiling above the basement (floor) with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 122.000,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 67.400,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 85.000,00€
Insulating the ceiling (roof) with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 88.000,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 125.000,00€
Insulating the ceiling (roof) with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 162.000,00€
Insulating the exterior walls with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 85.400,00€
Insulating the ceiling (roof) with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 92.000,00€
Insulating the ceiling (roof) with 100 mm mineral wool
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 112.000,00€
Insulating the exterior walls with 100 mm mineral wool of one block of Cahul Rayon Hospital
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 245.000,00€
Insulating the ceiling (roof) with 100 mm mineral wool of Cahul Rayon Hospital
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 186.000,00€
Insulating the ceiling above the basement (floor) with 100 mm mineral wool of Cahul Rayon Hospital
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 95.000,00€
Thermal insulation of academic buildings of B.P. Hasdeu University with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 92.000,00€
Thermal insulation of student dormitories of B.P. Hasdeu University with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 110.000,00€
Thermal insulation of academic buildings of Iulia Hasdeu Pedagogical College with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 95.000,00€
Thermal insulation of student dormitories of Iulia Hasdeu Pedagogical College with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 105.000,00€
Thermal insulation of academic buildings of Cahul Medical College with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Health
Implementation Cost: 125.000,00€
Thermal insulation of student dormitories of Cahul Medical College with 100 mm mineral wool
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 110.000,00€
Insulating the exterior walls with 100 mm mineral wool of Ioan Voda Lyceum
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 85.200,00€
Insulating the ceiling (roof) with 100 mm mineral wool of Ioan Voda Lyceum
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 75.400,00€
Insulating the exterior walls with 100 mm mineral wool of Cahul Regional Museum
Implementation Timeframe: 2022-2030
Sector: Buildings
Implementation Cost: 64.000,00€
Installation of 200 kW PV panels for SA Apa Canal Cahul (state water utility company) to cover needs for electricity. Connected by net-billing scheme
Implementation Timeframe: 2024-2028
Sector: Electricity
Implementation Cost: 180.000,00€
Rehabilitation of the water distribution and main pipes in SA Apa Canal Cahul (state water utility company).
Implementation Timeframe: 2024-2028
Sector: Energy
Implementation Cost: 148.000,00€
Modernization of the waste transport vehicle fleet (specialized vehicles) of IM Gospodaria Comunal Locativă Cahul (local utilities company).
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 385.000,00€
Promotion of measures for thermal rehabilitation of building envelopes: thermal insulation with 100 mm mineral wool of exterior walls, attic floor, floor above the unheated basement; replacement of windows.
Promotion Campaign can include:
- Banners with information about energy efficiency measures
- Seminars and training sessions for citizens with participation of experts from the National Center for Sustainable Energy, NGOs, business reprisentatives and financing institutions (EU4Business, commercial banks) to raise awareness
- Other activities
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 35.000,00€
Promotion of reducing thermal energy supply during periods when the building is unoccupied, such as installing thermostats and thermostatic valves
Implementation Timeframe: 2024-2030
Sector: Residential
Implementation Cost: 35.000,00€
Promotion of replacing polluting fuels (especially coal) with biomass fuels.
Promotion campaign for use of biomass among citizens with the following methods:
- banners and fliers with information about efficient methodes of use of biomass for heating,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies from the State and donors
- other
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 35.000,00€
Promotion campaign for renewable energy sources among citizens with the following methods:
- banners and fliers with information about renewable energy sources,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
Can be performed in partnership with National Center for Sustainable Energy, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 35.000,00€
Promotion campaign for renewable energy sources among citizens with the following methods:
- banners and fliers with information about renewable energy sources,
- seminars, trainings, school lessons - for raise of awareness among population,
- small grants and subsidies
- other
Can be performed in partnership with National Center for Sustainable Energy, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2024-2030
Sector: Electricity
Implementation Cost: 35.000,00€
Installation of a photovoltaic solar system to cover either approximately 50% or even 100% of the electricity needed for street lighting - solar PV system of approx. 200 kW capacity
Implementation Timeframe: 2022-2030
Sector: Electricity
Implementation Cost: 174.000,00€
Installation of electric PV charging stations on public buildings and residential houses to supply electric transport (200 kW).
Can be done in partnership with building owners, electric chargers networks businesses, Center for Sustainable Energy, Ministry of Energy, NGOs etc.
Implementation Timeframe: 2025-2030
Sector: Electricity
Implementation Cost: 220.000,00€
Attracting investors to establish a photovoltaic park to replace grid energy with energy produced from renewable sources to compensate for domestic and commercial consumption.
Implementation Timeframe: 2022-2030
Sector: Electricity
Implementation Cost: 200.000,00€
Organization of a solid waste separation and reuse system (minimum efficiency 40%), following the National Plan on Waste Management
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 490.000,00€
Local program to stimulate smart water management use among citizens.
Program for Water Efficiency can include:
- Banners with information about water saving measures, new technologies and importance of the measure
- Seminars and training sessions for citizens with participation of experts from the National Center for Sustainable Energy, Environmental Agency, NGOs to raise awareness
- Other activities
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 25.000,00€
Afforestation of land (planting forests and parks) in urban areas and for protection needs (10 ha - 8,000 trees)
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 60.000,00€
Action Plan
Target 2030
Approval date: 2024-07-26
| Decision on SECAP Approval | ro | Download |
|---|---|---|
| SECAP Cahul | ro | Download |
Commitments
| Commitment 2030 | ro | Download |
|---|
The signatory’s information in MyCovenant was last submitted in 2024.