Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Ukraine
Committed since 2021
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
1.01 thermal renovation of the school of arts MITIGATION
Insulation, overhaul of the facade and roof of the School of Arts, installation of a thermal energy metering mete
Implementation Timeframe: 2025-2030
Sector: Municipal
Implementation Cost: 65.000,00€
1.03 thermal renovation of the central library named after v. bulaenko MITIGATION
Капітальний ремонт фасаду Центральної бібліотеки ім.В. Булаєнка
Implementation Timeframe: 2027-2027
Sector: Municipal
Implementation Cost: 37.500,00€
3.01 installation of a modular boiler room near gymnasium no. 2 in krasyliv MITIGATION
Installation of a modular boiler house near gymnasium No. 2 in Krasyliv to reduce the load on the boiler house located at B. Khmelnytskyi, 2, which will lead to a reduction in heavy heat pipes that need to be replaced and reduce the heat load on the boiler house on the street. B. Khmelnytskoho, 2
Implementation Timeframe: 2024-2030
Sector: Heat
Implementation Cost: 75.000,00€
3.13 installation of a solar power plant with a capacity of 100 kw/h for the maintenance of water treatment facilities no. 1 of the krasylivskyi pvkg, zastavky village MITIGATION
Встановлення сонячної електростанції потужністю 100 кВт/год для забезпечення безперебійної роботи очисних споруд №1 Красилівського ПВКГ
Implementation Timeframe: 2025-2026
Sector: Waste
Implementation Cost: 25.000,00€
7.03 development of the waste management system ADAPTATION
Development of a solid waste management program. Formation of a plan of activities for the implementation of the Program. Creation of infrastructure for sorting and processing priority types of waste.
Purchase and installation of containers for separate collection of solid waste. Carrying out information and educational work with the population regarding the culture of waste management.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 20.600,00€
7.06 reconstruction of sewage treatment plant no. 1 of the krasylivsky pvkg village of zastavky, krasylivskyi district, khmelnytskyi region ADAPTATION
The reconstruction of sewage treatment plant No. 1 of the Krasylivskyi Sewage Treatment Plant with a capacity of 3,400 m3/day is aimed at solving the existing problem—environmental pollution, low-quality provision of residential and communal services in the part of water drainage. Reconstruction of treatment facilities will include:
- construction of a mechanical cleaning building;
- reconstruction of sand traps;
- reconstruction of two illuminators and suppressors for averaging;
- reconstruction of four illuminators and rotators;
- reconstruction of structures and buildings of air tanks;
- reconstruction of radial secondary clarifiers;
- reconstruction of tanks for sediment and activated sl
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 2.072.500,00€
7.01 modernization of storm sewer networks ADAPTATION
Carrying out current repairs to the existing storm sewer system. Major repairs to storm drains. Installing storm drain grates where they are missing and replacing existing worn-out ones with new ones. Installing sand traps to prevent silting of wells and collectors with sand and household waste, etc. Monitoring the cleaning of drains and maintenance of storm sewers
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 20.600,00€
Action Plan
Target 2030
Approval date: 2023-12-14
| Decision of the city council on approval of SECAP | uk | Download |
|---|---|---|
| SECAP Krasyliv 2030 | uk | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2023.