Key Actions
Use of renewable energy sources in budget buildings MITIGATION
Implementation of a hot water system with solar collectors, use of heat pumps in budget buildings
Implementation Timeframe: 2023-2030
Sector: Municipal
Implementation Cost: 1.170.000,00€
Implementation of the smart light intelligent lighting control system MITIGATION
Creation of a system of automated and dispatcher management and control of urban outdoor lighting
Implementation Timeframe: 2025-2027
Sector: Municipal
Implementation Cost: 143.808,00€
Use of “green energy” in residential buildings MITIGATION
Solar electricity generation, use of heat pumps, electricity generation at the landfill, cogeneration
Implementation Timeframe: 2026-2030
Sector: Residential
Implementation Cost: 9.432.532,00€
Protection and rational use of land ADAPTATION
Carrying out a set of measures to monitor the condition of the destroyed areas, necessary research and bank protection works; Anti-landslide measures in the coastal zone in the area of the 9th microdistrict;
Development of project documentation to restore the resource potential of the destroyed recreational areas;
Ensuring appropriate conditions within the coastal, water protection and recreational areas, strengthening information work;
Ensuring free access to the Black Sea coast within the Chornomorsk city territorial community - production and installation of security and information signs for the territories of the water protection and coastal protection zone
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 1.635.000,00€
Protection of the population and territories of the chornomorsk city territorial community in case of emergencies ADAPTATION
Monitoring of emergencies, forecasting the probability of their occurrence and determining risk indicators
Preventing the occurrence of man-made and natural disasters, reducing damage and losses in case of their occurrence, and efficiently eliminating the consequences of disasters,
Improvement of public notification of the threat and occurrence of industrial and natural emergencies,
Improvement of the engineering protection system of the Chornomorsk city territorial community,
Improving the state of informing the population about the threat or occurrence of emergencies and its actions in these situations
Implementation Timeframe: 2024-2025
Sector: Buildings
Implementation Cost: 29.400,00€
Protection and rational use of water resources ADAPTATION
Reconstruction of treatment facilities to reuse treated and disinfected wastewater.
Implementation of sludge utilization technology;
Reconstruction of a section of the sewer collector;
Implementation Timeframe: 2024-2029
Sector: Transport
Implementation Cost: 4.208.000,00€