Key Actions
SUSTITUCIÓN A LEDs
Implementation Timeframe: 2015-2020
Sector: Municipal
Implementation Cost: 800.000,00€
GHG Reduction: 156.45 tonnes
The mission of this project is to re-naturalize this green space of the city, recovering plant mass of the city and providing them with accessibility and activities, for the use and enjoyment of citizens, as well as the promotion of activities
Economic issues linked to "green activity". The project is vital for the natural recovery of Monte de Las Mesas, but also for the resilient environmental commitment of the city of Santa Cruz, guaranteeing green spaces, which allow to offset the carbon footprint of the city, encourage the promotion of "green" economic activity and that allow to structure the relationship of citizens with nature.
Implementation Timeframe: 2022-2025
Sector: Buildings
Implementation Cost: 3.500.000,00€
At present, the collection of organic waste (fifth container) is being implemented, which is a preliminary step for the widespread implementation of community composting. The means of deposit and locations will be enabled to facilitate separation, as well as to give preference to the local reuse of the resulting fertilizer, so that organic farming is promoted thanks to the availability of a resource necessary for its development.
Implementation Timeframe: 2026-2030
Sector: Buildings
Implementation Cost: 144.000,00€
PROYECTOS Y EVENTOS MEDIOAMBIENTALES DE CONCIENCIACIÓN Y SENSIBILIZACIÓN AL PÚBLICO EN GENERAL Y ESCOLARES DEL MUNICIPIO
Implementation Timeframe: 2015-2020
Sector: Residential
Implementation Cost: 171.877,00€
GHG Reduction: 6.94 tonnes
CONTRATACIÓN DE SERVICIO RENTING PARA LA FLOTA MUNICIPAL DE VEHÍCULOS HÍBRIDOS
Implementation Timeframe: 2015-2020
Sector: Transport
Implementation Cost: 4.000.000,00€
GHG Reduction: 214.81 tonnes
The action consists of installing systems in self-consumption of photovoltaic solar energy. These actions aim to reduce the electricity consumption of buildings, as well as contribute to the reduction of emissions and benefit other users by taking advantage of the maximum generation potential thanks to the collective self-consumption modality. 35 projects will be carried out (public schools)
Implementation Timeframe: 2022-2030
Sector: Municipal
Implementation Cost: 2.000.000,00€
It is about creating diversified urban environments that allow people to have day-to-day services, being able to avoid traveling at a distance that takes more than 15 minutes.This initiative involves a redesign of environments at the neighborhood level, encouraging the location of public and private services in a decentralized manner whenever possible and facilitating mobility on foot. It seeks to transform the city and its districts for bicycles, personal mobility vehicles and pedestrians, creating in turn corridors and green infrastructure within the city, in order to implement measures to adapt to climate change.
Implementation Timeframe: 2022-2030
Sector: Tertiary
Implementation Cost: 7.465.000,00€
The public company Transportes Interurbanos de Tenerife, S.A. (TITSA, owned by the Cabildo de Tenerife) is analysing and testing different low-emission mobility options, so that, in the coming years, emission levels will be reduced due to the inclusion of more sustainable models. The action estimates that in the time horizon of the Plan the total replacement of the buses will be undertaken
current by low-emission vehicles, but attending to a conservative scenario of emission reduction estimates, taking into account the technology used.
Implementation Timeframe: 2022-2030
Sector: Transport
Implementation Cost: 30.000.000,00€
The action consists of the execution of the measures of the Sustainable Urban Mobility Plan (SUMP)1 of the municipality approved in 2015, with a revised version as of January 9, 2022.The SUMP is a municipal management tool to efficiently organize the different modes of transport. promoting those more respectful with the environment (on foot, by bike, public transport) and rationalizing the use of motorized transport, especially the car. Within this measure, other actions to gain traffic space for pedestrians are also integrated, with the consequent restrictions on motorized mobility.This is established within the municipal SUMP of the municipality of Santa Cruz de Tenerife.
Implementation Timeframe: 2022-2030
Sector: Transport
Implementation Cost: 6.641.082,00€
The management of urban waste is fundamental in this challenge, since the result of daily actions becomes waste that must receive adequate treatment. Citizen awareness and collaboration are essential to reduce waste, reuse and recycle materials that continue to have a use thanks to their transformation. To this end, awareness campaigns are designed and implemented at all levels of the population and in the different environments where it is concentrated. In addition, guides to good practices, recommendations, incentives and penalties will be established. As a specific action, the preparation of Waste Prevention and Management Plans is contemplated (New Municipal Waste Ordinance)
Implementation Timeframe: 2022-2030
Sector: Waste
Implementation Cost: 60.000,00€
The objective of this measure is to establish, in the first instance, regulations promoted by the municipal council in order to favor other forms of organization of energy activities from the perspective of the social and collaborative economy and just transition. It is proposed that households in a situation of energy poverty can benefit from collective self-consumption in the modalities regulated by Royal Decree 244/2019, especially where there are municipal buildings or facilities in which it is possible to install photovoltaic panels for a power exceeding the needs own, so that the surplus is shared with the adjoining homes (service centers of the council itself, CEIP's, IES and others)
Implementation Timeframe: 2023-2030
The City Council of Santa Cruz de Tenerife seeks to promote its Municipal Green Infrastructure Plan. To do this, in a first phase it will commission the drafting of its Municipal Green Infrastructure Plan. The objective is the design and promotion of urban green infrastructure towards the realization of the Green Infrastructure Plan aimed at improving the quality of life and improving biodiversity, where the maxim of the City Council establishes the objective of "achieving a green infrastructure that offers the maximum ecosystem services in a city where nature and city interact and enhance, while connecting and serving as backbone elements as an ecological corridor.
Implementation Timeframe: 2022-2028
Sector: Buildings
Implementation Cost: 275.000,00€
SUSTITUCIÓN A LEDs
Implementation Timeframe: 2015-2020
Sector: Municipal
Implementation Cost: 800.000,00€
GHG Reduction: 156.45 tonnes
PROYECTOS Y EVENTOS MEDIOAMBIENTALES DE CONCIENCIACIÓN Y SENSIBILIZACIÓN AL PÚBLICO EN GENERAL Y ESCOLARES DEL MUNICIPIO
Implementation Timeframe: 2015-2020
Sector: Residential
Implementation Cost: 171.877,00€
GHG Reduction: 6.94 tonnes
CONTRATACIÓN DE SERVICIO RENTING PARA LA FLOTA MUNICIPAL DE VEHÍCULOS HÍBRIDOS
Implementation Timeframe: 2015-2020
Sector: Transport
Implementation Cost: 4.000.000,00€
GHG Reduction: 214.81 tonnes
Action Plan
Target 2030
Approval date: 2023-03-31
| CERTIFICATE OF APPROVAL IN MUNICIPAL PLENARY HEADQUARTERS. MARCH 30, 2023 | es | Download |
|---|---|---|
| MAYOR'S COMMITMENT DOCUMENT WITH THE COVENANT OF MAYORS | es | Download |
| SUSTAINABLE ENERGY AND CLIMATE ACTION PLAN. SANTA CRUZ DE TENERIFE | es | Download |
Target 2020
Approval date: 2014-08-07
| INVENTARIO DE EMISIONES | – | Download |
|---|---|---|
| INVENTARIO DE EMISIONES | es | Download |
| PAES SANTA CRUZ DE TENERIFE | es | Download |
Monitoring Report
Latest monitoring Report:
2026
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2026.