Signatory

2050
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Cyprus
Committed since 2012
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Le2. creation of an energy community MITIGATION ENERGY POVERTY
- Create a cooperative with citizens for the installation of photovoltaic panels with a capacity of 0.5MW.
- This allows citizens to purchase shares in the investment, reducing the capital cost for the municipality and strengthening democratic processes.
Implementation Timeframe: 2025-2027
Sector: Electricity
Implementation Cost: 500.000,00€
W2. sustainable waste management MITIGATION
Implementation of ''Pay-as-you-throw'' system and separate collection of organic waste
Exploitation of pruning for the production of fertilizer (compost) and biomass production
Implementation Timeframe: 2024-2030
Sector: Waste
Implementation Cost: 3.000.000,00€
Mb3. energy upgrade measures in various buildings of the municipality MITIGATION
The municipality has dozens of buildings, many of which are in need of energy upgrades.
After a study, it will be necessary to decide which buildings will be upgraded and to what extent.
Implementation Timeframe: 2025-2030
Sector: Municipal
Implementation Cost: 600.000,00€
Aq3. adaptation to floods ADAPTATION
- Promotion of nature-based solutions (NbS) and water storage/retention tanks along the Pedieos River for flood protection.
- Reduction in pollution levels and improvement in runoff quality.
- Decrease in water consumption for private garden irrigation through rainwater harvesting.
- Promotion of green materials like permeable surfaces and green solutions such as vertical gardens, green roofs, and retention ponds.
- Promotion of a green economy, green jobs, and products.
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 6.000.000,00€
Tr21. urban planning MITIGATION
This action includes:
- Low-speed roads
- One way streets / Pedestrianisations
Implementation Timeframe: 2024-2030
Sector: Transport
Implementation Cost: 100.000,00€
Bio1: enhancement of carbon sinks ADAPTATION
-Maintenance of existing green spaces
-Creation of new green spaces/tree planting
Implementation Timeframe: 2024-2030
Sector: Buildings
Implementation Cost: 1.493.770,00€
Simplified energy audits in vulnerable households ENERGY POVERTY
Simplified energy audits can be carried out in households to identify areas for energy upgrades. It is recommended that the audits be carried out in at least 50 homes that fall into the category of energy poverty. Already, through the technical support offered by the Cyprus Energy Agency, inspections have been/will be carried out in 7 homes in the municipality.
Implementation Timeframe: 2024-2030
Implementation Cost: 12.500,00€
Households energy checks MITIGATION
The Nicosia Municipality in cooperation with the Cyprus Energy Agency have implemented 20 Energy Audits in residential buildings of Municipality by subsidizing 50% of the cost. The purpose of the energy audits was to analyze the energy flows in the buildings and to provide advices for energy saving. The energy savings reached 27% of the total energy consumption of the buildings
Implementation Timeframe: 2015-2020
Sector: Residential
Implementation Cost: 800,00€
GHG Reduction: 18 tonnes
Bicycles for municipal police MITIGATION
Municipal police proceeded to the purchase of 10 bicycles for the purpose of policing and control of illegal parking in the Municipal boundaries. This has raised the awareness of the use of bicycles
Implementation Timeframe: 2015-2018
Sector: Transport
Implementation Cost: 3.500,00€
GHG Reduction: 1 tonne
Establishment of municipal transportation management office (the study has been implemented) MITIGATION
The study for the Establishment of Municipal fleet management office has already been implemented. The study assess the current situation of the Municipal fleet in order to identify actions for managing and upgrading the fleet and to achieve energy savings of 20% or more.
Implementation Timeframe: 2014-2020
Sector: Transport
Implementation Cost: 7.500,00€
GHG Reduction: 5 tonnes
Action Plan
Target 2020
Approval date: 2014-01-02
| Lefkosia towards low carbon future | el | Download |
|---|---|---|
| Lefkosia towards low carbon future (Summary) | en | Download |
| SEAP summary presentation | el | Download |
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2025.
