Energy efficiency in public lighting MITIGATION
Upcoming planned work on the public lighting system can be divided into two main types:
- Energy efficiency of public lighting systems and revamping of connected systems;
- Installation of smart technologies and remote control.
The Municipality of Campi Salentina, through the ELENA Project, plans to carry out the replacement of 2,210 lighting fixtures with others with LED technology.
Implementation Timeframe: 2020-2030
Sector: Other_old
Implementation Cost: 1.393.909,71€
Soft mobility plans and works MITIGATION
The drafting of the Municipal Cycling Mobility Plan makes it possible to achieve important and tangible results on city development over the next ten years.
The Plan is part of the future planning of infrastructure interventions, time and resources. Investing in soft mobility encourages citizens to choose sustainability, proposing a vision to 2030 and a phased action programme to reduce CO2 emissions.
An important aspect is the integration of the Plan in a wider scale, represented by the drafting of an Urban Plan for Sustainable Mobility.
Implementation Timeframe: 2020-2030
Sector: Transport
Implementation Cost: 1.618.450,00€
Renewable energy community MITIGATION ENERGY POVERTY
Main actions suggested for the development of renewable energy communities are:
- The inclusion in the municipal regulations of the strategy to be pursued to combat and adapt to climate change;
- The inclusion in the municipal regulations of energy indications, where homogeneous characteristics are developed in terms of built-up area, land uses and coverage, size, user needs, availability of renewable sources, energy savings and pre-existence of other energy vectors, etc.
- The adoption of a specific protocol of agreement, to which public and private stakeholders can comply with the primary purpose of independently consuming energy produced from renewable sources within the community itself.
Implementation Timeframe: 2020-2030
Sector: Electricity
Implementation Cost: 20.000,00€
Energy efficiency in municipal buildings and renewable energy integrated production MITIGATION
The goal for the coming years is to continue to develop and implement a comprehensive program of interventions aimed at energy upgrading of the most energy consuming municipal buildings and reducing energy demand. A preliminary analysis was conducted to acquire and verify all information about the buildings to be renovated from various points of view: thermal and electrical energy consumption, number of present and future users, energy certification, building conditions (envelope, windows, thermal and electrical systems, fire safety, etc.), landscape constraints, and possible hydrogeological risks.
Implementation Timeframe: 2020-2030
Sector: Municipal
Implementation Cost: 4.498.026,27€
Updating the civil protection plan ADAPTATION
Constant risk monitoring by the Civil Protection is necessary: regular updating of risk maps and the development of an adequate clear communication plan to the population; a periodic census of the population and buildings in high-risk areas, with particular regard to non-self-sufficient persons; the availability of means of transport to be used to transport them in the event of an emergency; information to the population on the risks present in the municipal territory and on the relevant behavioural rules and warning systems used in the event of an emergency.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 20.000,00€
Planting and public green ADAPTATION
This action proposes the increase of municipal green areas, properly designed and maintained, through the planting of plants, and new green areas. All green spaces must be designed and planned taking into consideration the tree species that consume less water, are more resistant to high temperatures and also the possible impacts in terms of pollen allergies.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 100.000,00€
Infrastructure interventions for rainwater management ADAPTATION
The municipal administration, in a broader effort to protect against the risk of flooding, intends to maintain, restore and adapt the series of natural chasms and sinkholes already present in the area. The drainage basins relating to the municipal territory, which are distinct and different, are connected by the existing rainwater sewerage network by means of the simple principle of communicating vessels: both the whitewater sewerage network and the manholed district canal (both existing), which, although they do not perform a flood defence function, should be duly taken into account in the sizing of the flood risk mitigation works, due to their hydraulic connection function.
Implementation Timeframe: 2020-2030
Sector: Buildings
Implementation Cost: 6.590.000,00€
Action Plan
Target 2020
Approval date: 2014-03-21
| Delibera di Consiglio Comunale - Approvazione PAES | it | Download |
|---|---|---|
| P.A.E.S. - Piano d'Azione per l'Energia Sostenibile del Comune di Campi Salentina | it | Download |
Commitments
| Commitment 2050 | it | Download |
|---|---|---|
| Commitment 2020 | en | Download |
| Commitment Adapt | it | Download |
The signatory’s information in MyCovenant was last submitted in 2025.