Installation of pv systems up to 30 kw on the rooftops of the municipal buildings MITIGATION
Install photovoltaic systems with an installed power of up to 30 kW on facilities where there are optimal conditions for roof sunshine and installation of a photovoltaic system.
Implementation Timeframe: 2018-2050
Sector: Municipal
Implementation Cost: 260.000,00€
Installation of pv systems on the rooftops of family houses MITIGATION
This measure proposes the installation of small PV plants (from 3 up to 5 kW) on the rooftops of family houses in order to increase RES usage in the city and thus making city electricity independent city by 2050.
Implementation Timeframe: 2015-2050
Sector: Residential
Implementation Cost: 2.660.000,00€
Agglomeration ADAPTATION
Upgrading of the wastewater treatment plant, construction of new and reconstruction of existing sewage system, separation of rainwater and sewage, expansion and reconstruction of the existing water supply system.
Implementation Timeframe: 2020-2023
Sector: Health
Implementation Cost: 34.250.000,00€
Conversion a part of land along watercourses into retentions ADAPTATION
The aim of the measure is to convert unused land into retentions which, in case of heavy rains or rising water levels in watercourses, will accept excess water and prevent flooding of buildings in the city area. Arrange the surrounding area for recreation of citizens (running tracks, bike paths, children's playgrounds, etc.).
Implementation Timeframe: 2021-2030
Sector: Buildings
Implementation Cost: 266.800,00€
Integration of the concept of green infrastructure into spatial and strategic planning processes ADAPTATION
It is necessary to integrate the concept of green infrastructure into spatial planning processes and policies and other strategic documents. It is recommended that when amending documents such as spatial and urban plans, special attention is paid to green infrastructure as an element in the organization of space.
Implementation Timeframe: 2019-2020
Sector: Buildings
Implementation Cost: 20.000,00€
Energy renovation of building sector MITIGATION ADAPTATION ENERGY POVERTY
The measure includes the reconstruction of the thermal insulation of the building's envelope and the repair of the roof and carpentry, as well as the replacement of the heating system. This measure primarily applies to buildings that have large energy losses caused by poor thermal insulation and inefficient heating systems.
Implementation Timeframe: 2010-2050
Sector: Buildings
Implementation Cost: 131.633.500,00€
Denivelation of the intersection between the state road d22 and the railway m201 in krizevci MITIGATION
After the opening of the D10 highway, the strategic connection of Krizevci with Zagreb, the traffic in the southern part of the city has multiplied. Due to the very busy level crossing (passenger and freight traffic) located on that side of the city, traffic jams are frequent. In order to relieve road traffic and prevent traffic jams, in 2020 the construction of an overpass above the railway will begin. This reduces standby time, engine idling and CO2 emissions, especially in the morning and afternoon.
Implementation Timeframe: 2020-2023
Sector: Transport
Implementation Cost: 7.640.000,00€
Installation of pv systems up to 30 kw on the rooftops of the municipal buildings MITIGATION
Install photovoltaic systems with an installed power of up to 30 kW on facilities where there are optimal conditions for roof sunshine and installation of a photovoltaic system.
Implementation Timeframe: 2018-2050
Sector: Municipal
Implementation Cost: 260.000,00€
GHG Reduction: 49.14 tonnes
Renewable Energy Production: 210 MWh
Installation of pv systems on the rooftops of family houses MITIGATION
This measure proposes the installation of small PV plants (from 3 up to 5 kW) on the rooftops of family houses in order to increase RES usage in the city and thus making city electricity independent city by 2050.
Implementation Timeframe: 2015-2050
Sector: Residential
Implementation Cost: 2.660.000,00€
GHG Reduction: 491.40 tonnes
Renewable Energy Production: 2100 MWh
Agglomeration ADAPTATION
Upgrading of the wastewater treatment plant, construction of new and reconstruction of existing sewage system, separation of rainwater and sewage, expansion and reconstruction of the existing water supply system.
Implementation Timeframe: 2020-2023
Sector: Buildings
Implementation Cost: 34.250.000,00€
Denivelation of the intersection between the state road d22 and the railway m201 in krizevci MITIGATION
After the opening of the D10 highway, the strategic connection of Krizevci with Zagreb, the traffic in the southern part of the city has multiplied. Due to the very busy level crossing (passenger and freight traffic) located on that side of the city, traffic jams are frequent. In order to relieve road traffic and prevent traffic jams, in 2020 the construction of an overpass above the railway will begin. This reduces standby time, engine idling and CO2 emissions, especially in the morning and afternoon.
Implementation Timeframe: 2020-2023
Sector: Transport
Implementation Cost: 7.640.000,00€
GHG Reduction: 44.67 tonnes
Energy renovation of building sector MITIGATION ADAPTATION ENERGY POVERTY
The measure includes the reconstruction of the thermal insulation of the building's envelope and the repair of the roof and carpentry, as well as the replacement of the heating system. This measure primarily applies to buildings that have large energy losses caused by poor thermal insulation and inefficient heating systems.
Implementation Timeframe: 2010-2050
Sector: Waste
Implementation Cost: 131.633.500,00€
GHG Reduction: 1336.73 tonnes
Action Plan
Target 2020
Approval date: 2012-07-17
| Akcijski plan energetski i klimatski odrzivog razvitka grada Krizevaca | hr | Download |
|---|---|---|
| Akcijski plan energetski i klimatski održivog razvitka grada Križevaca | hr | Download |
| Sustainable Energy Action Plan of Krizevci | hr | Download |
Monitoring Report
Latest monitoring Report:
2023
Commitments
| Commitment 2020 | en | Download |
|---|
The signatory’s information in MyCovenant was last submitted in 2025.