The thermal modernization of school #4 is carried out at the expense of NEFCO loan funds.
In the course of thermal modernization, the next energy-efficiency measures were performed:
- Replacement of windows and doors with metal-plastic,
- Warming of the facade of the building,
- Installation of Individual heat point of Block 2 in the school,
- Chemical cleaning of heating pipes,
- Installation of reflective screens behind batteries.
In the second phase of the work was performed:
- Warming of the facades of Block #2,
- Insulation of the roof.
Complex thermal modernization of School #2 was carried out within the framework of the European Commission Grant Project "Covenant of Mayors - Demonstration Projects".
The following works were performed:
- insulation of facades and basement,
- replacement of windows and doors with energy-efficient ones,
- installation of individual heat point (ITP),
- insulation of pipes,
- modernization of the ventilation system,
- replacement of lamps with LED,
- insulation of the roof.
The total reduction in energy consumption amounted to 50%.
The total reduction of CO2 emissions amounted to 52,5%.
After the completion of the project, the roof was insulated with other financing.
Complex thermal modernization of Kindergarten # "Kalinka" was carried out within the framework of the "Covenant of Mayors - Demonstration Projects" Grant Project.
In the project, the next energy-efficient entry was announced:
- іnsulation of facades and basement,
- replacement of windows and doors with energy-efficient ones,
- installation of individual heat point (ITP),
- insulation of pipes,
- insulation of the lower floor,
- modernization of the ventilation system,
- replacement of lamps with LEDs,
- dispatching of energy consumption.
Overall reduction in energy consumption - 66.5%.
Overall reduction of CO2 emissions - 61.9%.
Insulation of facades and basement,
replacement of windows and doors with energy-efficient ones,
installation of individual heat point (ITP),
insulation of pipes,
modernization of the ventilation system,
replacement of lamps with LED,
installation of heat pumps.
Комплексная термомодернизация Школы №2 была выполнена в рамках Грантового проекта Европейской Комиссии "Соглашение мэров - Демонстрационные проекты". В ходе работ: утеплено фасады и цоколь здания, заменены окна и двери на энергоэффективные металлопластиковые, выполнена модернизация системы вентиляции и модернизирована внутренняя система освещения с использованием LED светильников.
Installation of heat meters in multi-storey apartment houses Slavutich allowed to determine the real share of losses in the city's heating systems. Residents now have reliable data on the heat consumption in their houses. Payment is carried out according to the meter readings. So if in houses with large consumption per 1 square meter residents must pay more. The installation of meters has contributed to the understanding of the need to carry out the termal reconstruction of residential buildings, the development of personal responsibility about comfort and well-being.
Комплексная термомодернизация Детского сада №1 "Калинка" было выполнено в рамках Грантового проекта "Соглашение мэров - демонстрационные проекты". В ходе проекта было: утеплено фасады и цоколь, утеплено нижнее перекрытие, заменены окна, установлено индивидуальный тепловой пункт, модернизировано систему вентиляции с использованием рекуператоров, выполнена замена светильников на LED.
Thermomodernization of kindergarten #8 was carried out at the expense of the municipality of Slavutych and the State Regional Development Fund in two stages:
First step:
- Partial roof insulation,
- Replacement of windows with energy-efficient metal-plastic.
Second phase:
- Full insulation of facades
- Installation of an individual heat point.
The thermomodernization of school #4 is carried out at the expense of NEFCO loan funds.
In the course of thermomodernization, next energy-efficiency measures were performed:
- Replacement of windows and doors with metal-plastic,
- Warming of the facade of the building,
- Installation of Individual heat point of Block 2 in the school,
- Chemical cleaning of heating pipes,
- Installation of reflective screens behind batteries.
In the second phase of the work will be performed:
- Warming of the facades of Block #2,
- Insulation of the roof.