Signatory

2030
|
Mitigation |
||
|
||
|
Adaptation |
||
|
||
|
Energy Poverty |
||
|
Spain
Committed since 2009
|
Javier Fernandez De Los Rios Torres
|
||
|
Mayor
|
MAIN CONTACTS
| Sonia Escudero Navarro |
SUPPORT
Overview
GHG emissions/capita
not available
Achieved Reduction
not available
Key Actions
Supply pricing ADAPTATION
Penalty for excessive consumption
Implementation Timeframe: 2018-2040
Sector: Water
Improvement of the potable water supply infrastructure ADAPTATION
Change of pipes in poor condition and installation of flow meters to carry out a control of water leaks in the supply network.
Implementation Timeframe: 2020-2030
Sector: Water
Implementation Cost: 2.000.000,00€
Reuse of healthy water for irrigation of green areas and street cleaning ADAPTATION
Tertiary treatment of the water discharged from the wastewater treatment station for its later use in irrigation of urban green areas, street cleaning, etc.
Implementation Timeframe: 2020-2040
Sector: Water
Implementation Cost: 50.000,00€
Shadow plan ADAPTATION
Increase in shade areas in the municipality, with emphasis on transit and recreational areas
Implementation Timeframe: 2018-2040
Sector: Land
Monitoring and control plan of the population sensitive to heat waves ADAPTATION
Control and monitoring of people most sensitive to the risks of heat stroke during periods of heat wave or days with extreme temperatures. This plan should include an awareness and awareness campaign explaining the risks of such climatic variations in health.
Implementation Timeframe: 2020-2040
Sector: Health
Design and implementation of a network of air quality in the municipality ADAPTATION
The monitoring network or air quality control will have as main objective the monitoring of polluting emissions for decision making in terms of reduction. Due to the current demographic census, there is no obligation to implement this measure.
Implementation Timeframe: 2030-2040
Sector: Health
Preparation of an emergency plan in the face of extreme weather events (droughts, floods, etc.) ADAPTATION
Emergency plan in the face of extreme weather events for the efficient provision of emergency services
Implementation Timeframe: 1990-1990
Sector: Civil
Prevention of buildings with high exposure to floods ADAPTATION
According to the municipal flood maps, actions will be taken to reduce the high risk of flood damage. In this sense, some of these actions can be the channeling of water, the waterproofing of buildings, the increase in the capacity of the sewage system, etc.
Implementation Timeframe: 1990-1990
Sector: Buildings
Promotion of electric self-consumption ADAPTATION
Measure to reduce the energy dependence of the Spanish Electricity Network when it comes to air conditioning of homes in order to reduce the risk of supply cuts due to collapse
Implementation Timeframe: 1990-1990
Sector: Energy
Implementation Cost: 5.000,00€
5.2.7. mobility rider: metropolitan cycleway MITIGATION
Creación de un carril bici que nace en el centro del casco urbano y descurre por una calzada exclusiva, conectándo la Rinconada y San José con Sevilla, con una longitud aproximada de 22,5 km.
Implementation Timeframe: 2011-2020
Sector: Other
Implementation Cost: 680.000,00€
GHG Reduction: 1615.19 tonnes
5.1.3. underground and reurbanization almonazar MITIGATION
Eliminar la barrera natural del arroyo garantizando la accesibilidad espacial, mejorando el tránsito para peatones y vehículos con más espacio y sin obstáculos
Implementation Timeframe: 2010-2015
Sector: Other_old
Implementation Cost: 800.000,00€
GHG Reduction: 18.46 tonnes
2.2.1. second whiste-stop installation for local urban transport MITIGATION
Mejora de la internodalidad del transporte en el municipio con nuevo apeadero de cercanías
Implementation Timeframe: 2011-2020
Sector: Transport
Implementation Cost: 2.500.000,00€
GHG Reduction: 11.68 tonnes
2.2.5. parking expansion at the whisle-stop san jose MITIGATION
Apoyo a la mejora y agilización en el transporte y movilidad urbana
Implementation Timeframe: 2010-2010
Sector: Transport
Implementation Cost: 69.000,00€
GHG Reduction: 694.14 tonnes
1.3.1. bylaw thermal use of buildings MITIGATION
Area de Urbanismo del Ayuntamiento de La Rinconada
Implementation Timeframe: 2008-2010
Sector: Residential
1.1.1. lamp replacement and improving the efficiency of heating of some municipal buildings MITIGATION
Área de Urbanismo del Ayuntamiento de la Rinconada
Implementation Timeframe: 2008-2011
Sector: Municipal
Action Plan
Target 2020
Approval date: 2011-07-15
| Certificado Punto 4 pLENO 15-07-2011 PAES | en | Download |
|---|---|---|
| Sustainable Energy Action Plan of La Rinconada (Sevilla) | en | Download |
Monitoring Report
Latest monitoring Report:
2019
Commitments
| No documents available |
|---|
The signatory’s information in MyCovenant was last submitted in 2019.